Seventh Ward
2710 Annette Street is in Seventh Ward, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 2 permits on record here; the most recent, a construction loop permit, was filed in November 2005. 2 are still open. There were 7 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 4 requests to 311 and 18 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- Council district
- D
- Ward
- 7
- Lot size
- 2,627 sq ft
- Parcel
- 41076896
Everything on record here
9 records, newest first · 2 open
-
Code enforcement Case ENVHADJ-982364 Closed
The case was filed on 04/10/2009 but has since been closed without further action.
- Inspection: Inspection Complete
The city links this case to permit 05ELC-08995.
-
Code enforcement Case ENVHADJ-20005056HB Closed
The property was inspected on 05/10/2000 with a finding of "Complete". The file was subsequently closed.
- Inspection: Inspection Complete
The city links this case to permit 05ELC-08995.
-
Code enforcement Case ENVHADJ-20012337HB Closed
A hearing was held on 04/10/2009 with a result of "Dismissed". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Dismissed
The city links this case to permit 05ELC-08995.
-
Code enforcement Case ENVHADJ-20013198EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 05ELC-08995.
-
Code enforcement Case ENVHADJ-941492 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 05ELC-08995.
-
Code enforcement Case ENVHADJ-95322 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 05ELC-08995.
-
Code enforcement Case ENVHADJ-96501 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 05ELC-08995.
-
Permit Construction Loop Application Acceptance - Approved
const loop
- Permit
- 05ELC-08995
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Collins Electric
- Days from application to issue
- 10
-
Permit Building
BUILDING DEMOLITION AND DEBRIS REMOVAL VACANT LOT DEMOLITION TO GRADE OF A 1 STORY SINGLE FAMILY HOUSE AS PER OWNER'S REQUEST. INSIDE OF THE HCDRC DISTRICT.APPROVALS ARE NEEDED.
- Permit
- B02005099
- Type
- Building
- Days from application to issue
- 40