Filmore

5671 Cartier Avenue is in Filmore, zoned S-RS (Newer neighborhoods, single-family homes). The city has 6 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in August 2018. 1 is still open. A demolition permit was filed in July 2007. There were 4 past code enforcement cases, the latest in September 2013, all closed. On this block in the past year: 1 request to 311 and 3 calls to police.

Zoning
S-RS
Historic district
None
Council district
D
Ward
7
Lot size
7,588 sq ft
Parcel
41084725

Everything on record here

10 records, newest first · 1 open

  1. Permit Electrical Service / Circuit / Feeder Permit Finaled

    NEW SERVICE LIGHTS POWER ROUGH IN & TRIM OUT

    Permit
    18-26125-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $4,500
    Fees
    $169
    Contractor
    Brandon Augustus Francois
    Days from application to issue
    0
    Expires
    Feb 8, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Mechanical Fuel Gas Permit Finaled

    Gas service for a new construction single family residence

    Permit
    18-25938-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $3,400
    Fees
    $65
    Days from application to issue
    165
    Expires
    Jul 18, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Mechanical HVAC Permit Finaled

    New Construction

    Permit
    18-24219-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $1,000
    Fees
    $105
    Days from application to issue
    1
    Expires
    Jan 24, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Construction Loop Permit Finaled

    CONSTRUCTION LOOP / TEMP POLE

    Permit
    18-11365-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $500
    Fees
    $40
    Contractor
    Brandon Augustus Francois
    Days from application to issue
    0
    Expires
    Oct 4, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit New Construction Occupancy

    Construct 2884 sq ft 2-story single-family dwelling as per plans.

    Permit
    18-09155-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $409,179
    Fees
    $2,520
    Contractor
    Mallard Homes LLC, Stephen P Cali,Engineer
    Days from application to issue
    10
    Expires
    Sep 28, 2018
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  6. Code enforcement Case 13-07548-MPM Closed

    A hearing was held on 04/22/2014 with a result of "Guilty: Abated".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 160 Weeds and Plant Growth
    4. Violation: 161 Rodent Harborage
    5. Inspection: Posting of Hearing Notice Violation: No WIP
    6. Hearing: Initial Hearing Guilty: Abated

    The city links this case to permit 18-26125-SERV.

  7. Code enforcement Case CEHB-11-0422 Closed

    The property was inspected on 04/06/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied
    2. Inspection: Inspection Violation WIP

    The city links this case to permit 18-26125-SERV.

  8. Code enforcement Case HCES-11-02351 Closed

    The case was filed on 04/06/2011 but has since been closed without further action.

    The city links this case to permit 18-26125-SERV.

  9. Code enforcement Case ENVHADJ-10-03274 Closed

    A hearing was held on 12/14/2010 with a result of "Reset".

    1. Inspection: Inspection Adjudication Fast Track
    2. Hearing: Initial Hearing Reset

    The city links this case to permit 18-26125-SERV.

  10. Permit Demolition Application Acceptance - Approved No Review

    Demolition of hurricane damaged single residential unit. Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. A licensed plumber must secure a separate permit from the Sewage and Water Board to cap off sewer lines and remove water meters prior to demolition.

    Permit
    07BLD-07800
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $3,000
    Fees
    $90
    Days from application to issue
    5