6549 Pauline Drive is in Pontchartrain Park, zoned S-RS (Newer neighborhoods, single-family homes). The city has 5 permits on record here; the most recent, an electrical permit, was filed in September 2011. 5 are still open. A demolition permit was filed in December 2008. There was 1 past code enforcement case, the latest in September 2012, all closed. On this block in the past year: 0 requests to 311 and 5 calls to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- D
- Ward
- 9
- Lot size
- 5,498 sq ft
- Parcel
- 41086477
Everything on record here
6 records, newest first · 5 open
-
Code enforcement Case 12-10091-PNBL Closed
The property was inspected on 11/05/2012 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 11ELC-09439.
-
Permit Electrical Permit Issuance Active
REWIRE- 11BLD-04550
- Permit
- 11ELC-09439
- Type
- Electrical
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $114
-
Permit Residential Permit Issuance Active
SUPPLEMENT TO COMPLETE THE WORK STARTED UNDER 09BLD-01216: HVAC
- Permit
- 11BLD-04550
- Type
- Residential
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $110
-
Permit General Mechanical Inspection - Completed
anthony jeanmarie - ck#1345 - 1- electric waf 1- a/c cond.
- Permit
- 09MCH-07739
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $62
- Contractor
- Fast Air LLC
- Days from application to issue
- 5
-
Permit New Construction Sewer and Water Board Approval - Approved
Construct a 1200 sq ft 1-story single-family residence as per plans and Public Works Approval. Electrical, Hvac and Plumbing.
- Permit
- 09BLD-01216
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $72,000
- Fees
- $482
- Contractor
- K Crockett Designs,Llc
- Days from application to issue
- 9
-
Permit Demolition Inspection - Completed No Requirements
Demolition. All permits issued for demolition require the contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection. (Weigh tickets or invoice from an approved landfill will meet this requirement.) It is unlawful to leave debris, Section 103.20.2; City of New Orleans IBC Building Code)
- Permit
- 08BLD-08466
- Type
- Demolition
- Estimated cost (applicant’s figure)
- $3,500
- Fees
- $95