Gentilly Woods

5144 Saint Ferdinand Drive is in Gentilly Woods, zoned S-RS (Newer neighborhoods, single-family homes). The city has 2 permits on record here; the most recent, a demolition permit, was filed in March 2007. 2 are still open. A demolition permit was filed in March 2007. There are 4 open code enforcement cases. On this block in the past year: 15 requests to 311 and 5 calls to police.

Zoning
S-RS
Historic district
None
Council district
D
Ward
9
Lot size
5,562 sq ft
Parcel
41088295

Everything on record here

7 records, newest first · 6 open

  1. Code enforcement Case 26-08958-MPM Hearing

    The file has been processed and reviewed by a title examiner and is awaiting scheduling for a hearing.

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 159 Sidewalks
    3. Violation: 160 Weeds and Plant Growth
    4. Violation: 161 Rodent Harborage

    The city links this case to permit 07BLD-02386.

  2. Code enforcement Case 19-02989-MPM Judgment

    A hearing was held on 01/25/2022 with a result of "Guilty".

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 159 Sidewalks
    3. Violation: 160 Weeds and Plant Growth
    4. Violation: 161 Rodent Harborage
    5. Inspection: Posting of Hearing Notice Violation: No WIP
    6. Hearing: Initial Hearing Guilty

    The city links this case to permit 07BLD-02386.

  3. Code enforcement Case 15-09295-MPM Judgment

    A hearing was held on 12/07/2015 with a result of "Guilty".

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Driveways
    4. Violation: 159 Sidewalks
    5. Violation: 160 Weeds and Plant Growth
    6. Violation: 161 Rodent Harborage
    7. Violation: 164 Motor Vehicles
    8. Hearing: Initial Hearing Reset: Not Re-Inspected
    9. Inspection: Reinspection Violation: No WIP
    10. Hearing: Reset Hearing Guilty
    11. Inspection: Posting of Hearing Notice Violation: No WIP
    12. Inspection: Posting of Judgment Violation: No WIP

    The city links this case to permit 07BLD-02386.

  4. Code enforcement Case 15-06864-MPM Closed

    The property was inspected on 08/12/2015 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 160 Weeds and Plant Growth
    4. Violation: 161 Rodent Harborage
    5. Violation: 164 Motor Vehicles

    The city links this case to permit 07BLD-02386.

  5. Code enforcement Case 13-02909-PNBL Judgment

    A hearing was held on 09/04/2014 with a result of "Guilty".

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 28-20 Rodent Harborage
    3. Violation: 28-33 Duty to Mow Grass
    4. Violation: 28-33 Duty to Remove Trash and Debris
    5. Inspection: Posting of Hearing Notice Violation: WIP
    6. Hearing: Initial Hearing Guilty
    7. Inspection: Posting of Judgment Violation: No WIP

    The city links this case to permit 07BLD-02386.

  6. Permit Demolition Inspection - Completed No Requirements

    DEMOLITION TO GRADE OF VACANT HURRICANE DAMAGED SINGLE. CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND TO HAVE A FINAL INSPECTION OF THE SITE.A LICENSED PLIMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWERAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATE METERS PRIOR TO DEMOLITION

    Permit
    07BLD-02386
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $4,898
    Fees
    $100
    Contractor
    New Orleans Demolition
    Days from application to issue
    5
  7. Permit Electrical Application Approved

    TEMP POLE

    Permit
    06ELC-12164
    Type
    Electrical
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30