Desire Area
3416 Piety Street is in Desire Area, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 2 permits on record here; the most recent, a demolition permit, was filed in February 2007. 2 are still open. A demolition permit was filed in February 2007. There were 4 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 0 requests to 311 and 1 call to police.
- Zoning
- S-RD
- Historic district
- None
- Council district
- D
- Ward
- 9
- Lot size
- 3,784 sq ft
- Parcel
- 41091575
Everything on record here
6 records, newest first · 2 open
-
Code enforcement Case ENVHADJ-20043868SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 07COM-00284.
-
Code enforcement Case ENVHADJ-914099SH Closed
The property was inspected on 04/10/2009 with a finding of "Complete". The file was subsequently closed.
- Inspection: Inspection Complete
The city links this case to permit 07COM-00284.
-
Code enforcement Case ENVHADJ-923313 Closed
The case was filed on 04/10/2009 but has since been closed without further action.
The city links this case to permit 07COM-00284.
-
Code enforcement Case ENVHADJ-923505 Closed
The case was filed on 04/10/2009 but has since been closed without further action.
- Inspection: Inspection Complete
The city links this case to permit 07COM-00284.
-
Permit Demolition Inspection - Completed
Demolition of hurricane damaged MIXED USE BUILDING (VACANT GROCERY AND 1 RESIDENTIAL UNIT). Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. A licensed plumber must secure a separate permit from the Sewage and Water Board to cap off sewer lines and remove water meters prior to demolition.DAMAGED 100%
- Permit
- 07COM-00284
- Type
- Demolition
- Work
- NA
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Days from application to issue
- 5
-
Permit Construction Loop Application Acceptance - Approved
TEMP POLE
- Permit
- 06ELC-11513
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Days from application to issue
- 10