Pines Village

6360 Pandora Street is in Pines Village, zoned S-RS (Newer neighborhoods, single-family homes). The city has 2 permits on record here; the most recent, a demolition permit, was filed in March 2010. 2 are still open. A demolition permit was filed in March 2010. There were 3 past code enforcement cases, the latest in May 2019, all closed. On this block in the past year: 11 requests to 311 and 3 calls to police.

Zoning
S-RS
Historic district
None
Council district
D
Ward
9
Lot size
6,317 sq ft
Parcel
41091742

Everything on record here

5 records, newest first · 2 open

  1. Code enforcement Case 19-03810-MPM Closed

    The property was inspected on 04/24/2019 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 160 Weeds and Plant Growth

    The city links this case to permit 10BLD-01439.

  2. Code enforcement Case CEHB-11-2046 Closed

    A hearing was held on 06/06/2012 with a result of "Guilty: Public Nuisance".

    1. Inspection: Inspection Violation Unoccupied
    2. Inspection: Inspection Violation Posted No WIP
    3. Hearing: Initial Hearing Guilty: Public Nuisance

    The city links this case to permit 10BLD-01439.

  3. Code enforcement Case HCES-11-03317 Closed

    The case was filed on 04/29/2011 but has since been closed without further action.

    The city links this case to permit 10BLD-01439.

  4. Permit Demolition Application Acceptance - Approved No Review

    DEMOLITION TO GRADE SINGLE DWELLING. CONTRACTOR IS REQUIRED TO REMOVE ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. A SEPERATE PERMIT IS REQUIRED FROM SEWAGE AND WATER BOARD TO REMOVE WATER METER AND CAP SEWER LINE.

    Permit
    10BLD-01439
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $2,500
    Fees
    $110
    Days from application to issue
    5
  5. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS

    Permit
    09BLD-08076
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Contractor
    Camp Dresser & Mckee, Camp Dresser & Mckee
    Days from application to issue
    5