Plum Orchard
4542 Dale Street is in Plum Orchard, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 6 permits on record here; the most recent, an electrical repair / replacement / addition permit, was filed in October 2024. 5 are still open. There were 5 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 23 requests to 311 and 23 calls to police.
- Zoning
- S-RD
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 8,780 sq ft
- Parcel
- 41093422
Everything on record here
11 records, newest first · 5 open
-
Permit Electrical Repair / Replacement / Addition Permit Issued
Remove and replace ceiling fans and electrical boxes
- Permit
- 24-30959-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $1,730
- Fees
- $40
- Contractor
- Brian David Franklin
- Days from application to issue
- 9
- Expires
- Apr 18, 2025
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Mechanical HVAC Permit Finaled
Remove and replace 2.5 ton unit.
- Permit
- 24-30301-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $9,985
- Fees
- $45
- Days from application to issue
- 1
- Expires
- Apr 4, 2025
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Renovation (Non-Structural) In Review
Install new hot water heater. Install new condenser, Install blown-in insulation in attic, Install new asphalt shingle roof and provide termite treatment
- Permit
- 24-24795-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $26,711
- Fees
- $765
- Contractor
- TECC Enterprises LLC
- Application submitted
- Zoning review
-
Code enforcement Case ENVHADJ-97718 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 24-30959-ERPR.
-
Code enforcement Case ENVHADJ-98650SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 24-30959-ERPR.
-
Code enforcement Case ENVHADJ-20014193P Closed
A hearing was held on 05/12/2012 but the result of the hearing is still pending.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Result Pending
The city links this case to permit 24-30959-ERPR.
-
Code enforcement Case ENVHADJ-94390 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 24-30959-ERPR.
-
Code enforcement Case ENVHADJ-961579 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 24-30959-ERPR.
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
knew construction
- Permit
- 09ELC-06044
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $150
- Contractor
- Eddie J. Freeman
- Days from application to issue
- 10
-
Permit Construction Loop Application Acceptance - Approved
construction loop
- Permit
- 09ELC-06046
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Eddie J. Freeman
- Days from application to issue
- 10
-
Permit New Construction Certificate of Occupancy - Issued w/Meter
Construction of a 1040 sq ft 1-story single-family dwelling as per plans and Public Works Approval.
- Permit
- 09BLD-01269
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $0
- Fees
- $500
- Days from application to issue
- 8