Pines Village

7119 Downman Road is in Pines Village, zoned S-RS (Newer neighborhoods, single-family homes). The city has 6 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in September 2010. 6 are still open. A demolition permit was filed in March 2010. On this block in the past year: 9 requests to 311 and 34 calls to police.

Zoning
S-RS
Historic district
None
Council district
D
Ward
9
Lot size
7,341 sq ft
Parcel
41093733

Everything on record here

6 records, newest first · 6 open

  1. Permit Electrical Service / Circuit / Feeder Permit Issuance - Active

    NEW CONSTRUCTION & LOW VOLTAGE- 10BLD-01848

    Permit
    10ELC-09377
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $148
    Contractor
    Cls Electric LLC
    Days from application to issue
    0
  2. Permit General Mechanical Application Acceptance - Approved

    INSTALL ELEC WAF, ELEC W/H AND A\C. DAX BORDENAVE (#1709)

    Permit
    10MCH-07685
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $85
    Contractor
    Louisiana Hvac, Inc
    Days from application to issue
    9
  3. Permit New Construction Certificate of Occupancy - Issued w/Meter

    NEW CONSTRUCTION OF A 1450 sq ft 1-STORY SINGLE FAMILY DWELLING AS PER PLANS. PLAN 1136

    Permit
    10BLD-01848
    Type
    New Construction
    Work
    New
    Estimated cost (applicant’s figure)
    $145,000
    Fees
    $930
    Days from application to issue
    2
  4. Permit Demolition Inspection - Completed No Requirements

    DEMOLITION OF A SINGLE FAMILY DWELLING. CONTRACTOR IS REQUIRE TO REMOVE ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. A SEPERATE PERMIT IS REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINE AND REMOVE WAWTER METER. ANY FUTURE USE WILL NEED A SEPERATE PERMIT.

    Permit
    10BLD-01266
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $2,500
    Fees
    $110
    Days from application to issue
    5
  5. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS

    Permit
    09BLD-08065
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Contractor
    Camp Dresser & Mckee, Camp Dresser & Mckee
    Days from application to issue
    5
  6. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAS REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.

    Permit
    07BLD-08509
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Days from application to issue
    5