Pines Village
7119 Downman Road is in Pines Village, zoned S-RS (Newer neighborhoods, single-family homes). The city has 6 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in September 2010. 6 are still open. A demolition permit was filed in March 2010. On this block in the past year: 9 requests to 311 and 34 calls to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- D
- Ward
- 9
- Lot size
- 7,341 sq ft
- Parcel
- 41093733
Everything on record here
6 records, newest first · 6 open
-
Permit Electrical Service / Circuit / Feeder Permit Issuance - Active
NEW CONSTRUCTION & LOW VOLTAGE- 10BLD-01848
- Permit
- 10ELC-09377
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $148
- Contractor
- Cls Electric LLC
- Days from application to issue
- 0
-
Permit General Mechanical Application Acceptance - Approved
INSTALL ELEC WAF, ELEC W/H AND A\C. DAX BORDENAVE (#1709)
- Permit
- 10MCH-07685
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $85
- Contractor
- Louisiana Hvac, Inc
- Days from application to issue
- 9
-
Permit New Construction Certificate of Occupancy - Issued w/Meter
NEW CONSTRUCTION OF A 1450 sq ft 1-STORY SINGLE FAMILY DWELLING AS PER PLANS. PLAN 1136
- Permit
- 10BLD-01848
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $145,000
- Fees
- $930
- Days from application to issue
- 2
-
Permit Demolition Inspection - Completed No Requirements
DEMOLITION OF A SINGLE FAMILY DWELLING. CONTRACTOR IS REQUIRE TO REMOVE ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. A SEPERATE PERMIT IS REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINE AND REMOVE WAWTER METER. ANY FUTURE USE WILL NEED A SEPERATE PERMIT.
- Permit
- 10BLD-01266
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $2,500
- Fees
- $110
- Days from application to issue
- 5
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS
- Permit
- 09BLD-08065
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Contractor
- Camp Dresser & Mckee, Camp Dresser & Mckee
- Days from application to issue
- 5
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAS REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.
- Permit
- 07BLD-08509
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Days from application to issue
- 5