4517 Dale Street is in Plum Orchard, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 1 permit on record here; the most recent, a demolition permit, was filed in September 2012. 1 is still open. A demolition permit was filed in September 2012. There is 1 open code enforcement case. On this block in the past year: 23 requests to 311 and 23 calls to police.

Zoning
S-RD
Historic district
None
Council district
E
Ward
9
Lot size
6,068 sq ft
Parcel
41094847

Everything on record here

7 records, newest first · 2 open

  1. Code enforcement Case 16-10347-MPM Judgment

    A hearing was held on 12/06/2016 with a result of "Guilty".

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Driveways
    4. Violation: 167 Exterior Surfaces
    5. Violation: 167 Paint or Protective Treatment
    6. Violation: 167 Siding and Masonry
    7. Violation: 168 Premises Identification
    8. Violation: 169 Rafters
    9. Violation: 169 Structure
    10. Violation: 169 Studs
    11. Violation: 169 Floor Joists
    12. Violation: 171 Exterior Walls
    13. Violation: 172 Roofs
    14. Violation: 176 Decks Porches and Balconies
    15. Violation: 178 Handrails and Guardrails
    16. Violation: 179 Door Frames
    17. Violation: 179 Windows
    18. Violation: 181 Doors
    19. Inspection: Posting of Hearing Notice Violation: No WIP
    20. Hearing: Initial Hearing Guilty
    21. Inspection: Posting of Judgment Violation: No WIP

    The city links this case to permit 12-24990-DEMO.

  2. Code enforcement Case 12-10108-PNBL Closed

    The property was inspected on 09/25/2012 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 28-27 Chimneys
    3. Violation: 28-11 Columns
    4. Violation: 28-31 Doors
    5. Violation: 28-10 Paint / Protective Treatment
    6. Violation: 28-25 Fascia Boards
    7. Violation: 28-11 Floor Joists
    8. Violation: 28-12 Foundation
    9. Violation: 28-14 Gutters and Downspouts
    10. Violation: 28-28 Handrails and Guardrails
    11. Violation: 28-12 Piers
    12. Violation: 28-26 Porches, Decks, and Balconies
    13. Violation: 28-11 Rafters
    14. Violation: 28-14 Roof
    15. Violation: 28-13 Siding
    16. Violation: 28-29 Sills
    17. Violation: 28-25 Soffit
    18. Violation: 28-11 Structure
    19. Violation: 28-11 Studs
    20. Violation: 28-11 Upright Boards / Framing
    21. Violation: 28-13 Exterior Walls
    22. Violation: 28-13 Weatherboards
    23. Violation: 28-15 Boarded and Secured
    24. Violation: 28-16 Sanitation of Property and Premises
    25. Violation: 28-29 Door Frames
    26. Violation: 28-11 Floors
    27. Violation: 28-29 Windows

    The city links this case to permit 12-24990-DEMO.

  3. Permit Demolition Permit Issued

    Demolition permit issued to demolish vacant single family to grade. Contractor shall remove and dispose of all debris within 72 hours of completion. Proof of disposal required at time of ifnal inspection. Separate permit required from Sewerage and Water Board to cap off sewer lies and remove water meters. Structure collapsing-Imminent Danger.

    Permit
    12-24990-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $190
    Contractor
    LUTHER H CHAVIS
    Days from application to issue
    0
    Expires
    Mar 20, 2013

    See this permit on One Stop

  4. Code enforcement Case 12-08721-PNBL Closed

    A hearing was held on 04/15/2014 with a result of "Guilty".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 28-11 Structure
    3. Violation: 28-11 Floor Joists
    4. Violation: 28-25 Fascia Boards
    5. Violation: 28-25 Soffit
    6. Violation: 28-13 Exterior Walls
    7. Violation: 28-11 Studs
    8. Violation: 28-10 Paint / Protective Treatment
    9. Violation: 28-28 Handrails and Guardrails
    10. Violation: 28-26 Porches, Decks, and Balconies
    11. Violation: 28-14 Roof
    12. Violation: 28-11 Rafters
    13. Violation: 28-11 Floors
    14. Violation: 28-29 Windows
    15. Violation: 28-29 Door Frames
    16. Violation: 28-15 Boarded and Secured
    17. Violation: 28-16 Sanitation of Property and Premises
    18. Violation: 28-33 Duty to Mow Grass
    19. Violation: 28-20 Rodent Harborage
    20. Violation: 28-33 Duty to Remove Trash and Debris
    21. Inspection: Reinspection Violation: No WIP
    22. Inspection: Posting of Hearing Notice Violation: No WIP
    23. Hearing: Initial Hearing Guilty
    24. Inspection: Posting of Judgment Violation: No WIP

    The city links this case to permit 12-24990-DEMO.

  5. Code enforcement Case CEHB-12-0600 Closed

    The case was filed on 02/28/2012 but has since been closed without further action.

    The city links this case to permit 12-24990-DEMO.

  6. Code enforcement Case HCEVU-10-00450 Closed

    The property was inspected on 04/19/2010 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied

    The city links this case to permit 12-24990-DEMO.

  7. Code enforcement Case HCES-10-00295 Closed

    The case was filed on 04/19/2010 but has since been closed without further action.

    The city links this case to permit 12-24990-DEMO.