Little Woods

6941 Lake Willow Drive is in Little Woods, zoned S-RS (Newer neighborhoods, single-family homes). The city has 14 permits on record here; the most recent, a renovation (structural or non-structural) permit, was filed in October 2026. 10 are still open. On this block in the past year: 11 requests to 311 and 9 calls to police.

Zoning
S-RS
Historic district
None
Council district
E
Ward
9
Lot size
16,353 sq ft
Parcel
41097455

Everything on record here

14 records, newest first · 10 open

  1. Permit Renovation (Structural or Non-structural) In Review

    Install an Elevator inside residential home. NOTE: Re-roofing work does not require an inspection from Safety & Permits. Instead, upload the following geotagged photos to the permit: 4 geotagged photos (one from each side) showing:   – Removal of existing roof material   – Installation of water‑intrusion‑resistant underlayment   – Installation of drip edge and flashing   – Installation of shingles or metal panels After uploading all applicable photos, email to request permit closure.

    Permit
    26-30608-RENO
    Type
    Renovation (Structural or Non-structural)
    Work
    Renovation (Structural or Non-structural)
    Estimated cost (applicant’s figure)
    $0
    Fees
    $180
    1. Building Unpaid
    2. Building Plan Review Unpaid
    3. Application Submitted Complete
    4. Application submitted
    5. Parks and Parkways Tree Review Complete
    6. Zoning Review Complete
    7. Zoning Complete
    8. Zoning review
    9. Permit Intake Revisions Needed
    10. Plan Review Complete

    See this permit on One Stop

  2. Permit Solar Permit Issued

    Solar - Meter Check

    Permit
    14-00394-SOLR
    Type
    Solar
    Work
    Solar
    Estimated cost (applicant’s figure)
    $27,000
    Fees
    $52
    Days from application to issue
    2
    Expires
    Jul 8, 2014

    See this permit on One Stop

  3. Permit Renovation (Non-Structural) Permit Finaled

    Install 6.00kW Grid-Tie Solar PV system

    Permit
    13-48400-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $27,000
    Fees
    $195
    Days from application to issue
    1
    Expires
    Jun 20, 2014

    See this permit on One Stop

  4. Permit General Mechanical Permit Finaled

    ajm311, ck 2761 david 340-8541 2waf 2ac

    Permit
    13-43260-MECH
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $116
    Contractor
    David Meyer
    Days from application to issue
    0
    Expires
    May 5, 2014

    See this permit on One Stop

  5. Permit General Mechanical Permit Finaled

    ajm311, ck sly 382-5895 2hwh meter

    Permit
    13-36780-MECH
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $70
    Contractor
    Sylvester Carl Johnson
    Days from application to issue
    60
    Expires
    May 5, 2014

    See this permit on One Stop

  6. Permit Renovation (Non-Structural) Permit Issued

    Supplement to 09BLD-06242 to repair single - install front & back door, install garbage disposal, install gas meter.

    Permit
    13-32558-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $750
    Fees
    $65
    Days from application to issue
    0
    Expires
    Jan 30, 2014

    See this permit on One Stop

  7. Permit Electrical Service / Circuit / Feeder Permit Issuance - Active

    REWIRE- 09BLD-06242

    Permit
    10ELC-10583
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $196
    Contractor
    Carr's Electric
    Days from application to issue
    0
  8. Permit General Mechanical Inspection - Completed

    david-382-2877 ck#-7105 2-ac,2-waf

    Permit
    10MCH-07097
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $116
    Contractor
    Haydel Heating & A/C LLC
    Days from application to issue
    5
  9. Permit Construction Loop Application Acceptance - Approved

    TEMP POLE- 09BLD-06242

    Permit
    09ELC-15704
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Carr's Electric
    Days from application to issue
    10
  10. Permit Emergency Permit Application Acceptance - Approved No Review

    Hurricane repairs to a single family residence: Electrical,Hvac,Plumbing,Sheetrocking;Painting and others to make habitable.

    Permit
    09BLD-06242
    Type
    Emergency Permit
    Work
    Emergency Permit
    Estimated cost (applicant’s figure)
    $30,000
    Fees
    $200
    Days from application to issue
    5
  11. Permit General Mechanical Application Acceptance - Approved

    INSTALL GENERATOR SYSTEM. SIDNEY LEE (#18450)

    Permit
    08MCH-04763
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $25
    Contractor
    A/C Ambulance Ser
    Days from application to issue
    5
  12. Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved

    WATER DAMAGE REPLACE OF WRIE AND SERVICE

    Permit
    06ELC-11016
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    10
  13. Permit Residential APPROVAL

    Katrina Repairs

    Permit
    ACCELA-23906
    Type
    Residential
    Work
    Repair
    Estimated cost (applicant’s figure)
    $100,000
  14. Permit General Mechanical Application Acceptance - Approved

    install gas generator. sidney .

    Permit
    04MCH-05310
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $20
    Contractor
    A/C Ambulance Ser
    Days from application to issue
    5