Read Blvd West

4766 Bundy Road is in Read Blvd West, zoned S-RS (Newer neighborhoods, single-family homes). The city has 8 permits on record here; the most recent, a mechanical fuel gas permit, was filed in October 2026. 7 are still open. A demolition permit was filed in May 2010. A building here was demolished under the NORA program, completed in October 2010. There is 1 open code enforcement case. On this block in the past year: 13 requests to 311 and 13 calls to police.

Zoning
S-RS
Historic district
None
Council district
E
Ward
9
Lot size
6,233 sq ft
Parcel
41098884

Everything on record here

14 records, newest first · 8 open

  1. Permit Mechanical Fuel Gas Permit Issued

    Install new gas line for 3 fixtures. 1. stove 2. dryer 3. tankless water heater

    Permit
    26-31943-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $1,800
    Fees
    $40
    Contractor
    Ronnie Crosby
    Days from application to issue
    1
    Expires
    Apr 30, 2027
    1. Gas Line and Outlets Paid
    2. Water Heaters Paid
    3. Rough Mech Gas Res
    4. Gas Line
    5. Water Heater
    6. Application Submitted Complete
    7. Mechanical Permit Review Pending
    8. Application submitted
    9. Application Review Complete
    10. Permit Approved Complete
    11. Permit Issued Complete
    12. Mechanical Permit Review Complete
    13. Application review
    14. Permit approved
    15. Issue date

    See this permit on One Stop

  2. Permit Mechanical HVAC Permit Issued

    install 5 ton AC system with 15kw electric heat Ameristar

    Permit
    26-30720-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $9,200
    Fees
    $71
    Contractor
    Thong Paul Nguyen
    Days from application to issue
    2
    Expires
    Apr 19, 2027
    1. Air Conditioning Paid
    2. Mechanical Paid
    3. Warm Air Furnaces Paid
    4. Duct Leakage
    5. Warm Air Furnace
    6. Whole House Infiltration
    7. Air Conditioning
    8. Application Submitted Complete
    9. Application submitted
    10. Application Review Complete
    11. Permit Approved Complete
    12. Permit Issued Complete
    13. Mechanical Permit Review Complete
    14. Application review
    15. Permit approved
    16. Issue date
    17. Rough Mech HVAC Res Passed

    See this permit on One Stop

  3. Permit Electrical Service / Circuit / Feeder Permit Issued

    wire new house and temp pole

    Permit
    26-28695-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $12,000
    Fees
    $130
    Contractor
    Christopher Robert Hoke
    Days from application to issue
    8
    Expires
    Apr 8, 2027
    1. Electrical Paid
    2. Final Electric
    3. Rough Electrical
    4. UG Electrical
    5. Application Submitted Complete
    6. Application submitted
    7. Application Review Complete
    8. Permit Approved Complete
    9. Electrical Complete
    10. Application review
    11. Permit approved
    12. Permit Issued Complete
    13. Issue date

    See this permit on One Stop

  4. Permit Construction Loop Other

    Temp pole

    Permit
    26-28698-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $300
    Fees
    $40
    Contractor
    Christopher Robert Hoke
    Days from application to issue
    2
    Expires
    Apr 2, 2027
    1. Electrical Paid
    2. Construction Pole (Loop)
    3. Application Submitted Complete
    4. Application submitted
    5. Application Review Complete
    6. Permit Approved Complete
    7. Permit Issued Complete
    8. Electrical Complete
    9. Application review
    10. Permit approved
    11. Issue date
    12. Certificate of Completion Complete
    13. Meter Release Complete
    14. Temporary Pole Passed
    15. First inspection

    See this permit on One Stop

  5. Permit Plumbing Permit Permit Issued

    File permit for new construction.

    Permit
    26-28431-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $50
    Contractor
    RONNIE C CROSBY
    Days from application to issue
    4
    Expires
    Mar 29, 2027
    1. SWB Filing Fee Paid
    2. Plumbing Underground
    3. Plumbing Final
    4. Application Submitted Complete
    5. Application Review (SWB) Complete
    6. Permit Approved Complete
    7. SWBNO Plumbing Intake Approved
    8. SWBNO Plumbing Approval Approved
    9. Permit Issued Complete
    10. Plumbing Rough In/ Top Out Passed
    11. Plumbing Tie In Passed

    See this permit on One Stop

  6. Permit Driveway/ Curb Cut and Restoration Application Accepted

    Permit to construct driveway

    Permit
    26-24492-RDRV
    Type
    Driveway/ Curb Cut and Restoration
    Work
    Driveway/ Curb Cut and Restoration
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100
    1. Driveway/sidewalk Application Unpaid
    2. Driveway
    3. Application Submitted Complete
    4. Public Works - Traffic Pending
    5. Zoning Complete
    6. Parks and Parkways Tree Review Complete

    See this permit on One Stop

  7. Permit New Construction Permit Issued

    New construction single family, single-story dwelling; 4 bd 2 bath 1,802 sq.ft with a driveway to be built per plans

    Permit
    26-24088-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $198,080
    Fees
    $1,254
    Contractor
    WILLSTAND, INC
    Days from application to issue
    28
    Expires
    Mar 14, 2027
    1. Building Paid
    2. Building Plan Review Paid
    3. Residential Final C/O Inspection
    4. Residential Final C/O Documents
    5. Slab
    6. Rough Framing
    7. Footing
    8. Application Submitted Complete
    9. Application submitted
    10. GIS Addressing Complete
    11. Parks and Parkways Tree Review Approved
    12. Zoning Complete
    13. Floodplain Administration Complete
    14. SWBNO Plumbing Riser Approved
    15. Application Review Complete
    16. Zoning Review Complete
    17. Permit Intake Complete
    18. Application review
    19. Zoning review
    20. Plan Review Complete
    21. Permit Approved Complete
    22. Plan Review Complete
    23. Plan review
    24. Permit approved
    25. Permit Issued Complete
    26. Issue date

    See this permit on One Stop

  8. Code enforcement Case 25-08350-MPM Hearing

    A hearing was held on 06/09/2026 but the result of the hearing is still pending.

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Violation: 159 Sidewalks
    2. Inspection: Inspection Violation: No WIP
    3. Inspection: Posting of Hearing Notice Violation: No WIP
    4. Inspection: Inspection Violation: No WIP
    5. Violation: 159 Sidewalks
    6. Hearing: Initial Hearing Result Pending

    The city links this case to permit 26-31943-FGAS.

  9. Code enforcement Case 17-11396-MPM Closed

    The property was inspected on 09/06/2017 with a finding of "No Violation". The file was subsequently closed.

    1. Inspection: Inspection No Violation

    The city links this case to permit 26-31943-FGAS.

  10. Demolition NORA demolition Completed
    Program
    NORA
    Units
    1
    Started
    Oct 14, 2010
    Completed
    Oct 14, 2010

    Source: data.nola.gov BlightStatus demolitions (2009–2019, no longer updated)

  11. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH HURRICANE DAMAGED SINGLE TO GRADE AS PER OWNER'S REQUEST. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWERAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METERS PRIOR TO DEMILITION. ANY FURTHER USE SHALL REQUIRE A SEPARATE PERMIT. PLANS TO FOLLOW.

    Permit
    10BLD-02417
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $145
    Days from application to issue
    5
  12. Code enforcement Case HCEC-10-00368 Closed

    The case was filed on 02/25/2010 but has since been closed without further action.

    1. Inspection: Inspection Occupied

    The city links this case to permit 26-31943-FGAS.

  13. City record Plumbing Permit

    File plumbing permit for new construction.

    1. SWBNO Plumbing Intake review Pending
    2. SWBNO Plumbing Approval review Pending

    See this record on One Stop · checked Nov 15, 2026

  14. City record One Stop record

    File permit for plumbing new construction.

    See this record on One Stop · checked Nov 15, 2026