West Lake Forest
7700 North Coronet Court is in West Lake Forest, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 8 permits on record here; the most recent, an electrical vacancy permit, was filed in April 2024. 7 are still open. A demolition permit was filed in November 2007. There is 1 open code enforcement case. On this block in the past year: 37 requests to 311 and 46 calls to police.
- Zoning
- S-RD
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 9,102 sq ft
- Parcel
- 41099507
Everything on record here
12 records, newest first · 8 open
-
Code enforcement Case 26-03879-MPM Inspection
The case was filed on 04/27/2026 and the property is awaiting inspection to proceed further.
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
-
Permit Electrical Vacancy Permit Finaled
vacancy
- Permit
- 24-11697-EVAC
- Type
- Electrical Vacancy
- Work
- Electrical Vacancy
- Estimated cost (applicant’s figure)
- $300
- Fees
- $40
- Contractor
- Troy Mervin Rawlins
- Days from application to issue
- 0
- Expires
- Oct 19, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 14-00109-MPM Closed
The property was inspected on 02/14/2014 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 08ELC-17908.
-
Code enforcement Case CEHB-11-8281 Closed
The property was inspected on 12/02/2011 with a finding of "Occupied". The file was subsequently closed.
- Inspection: Inspection Occupied
The city links this case to permit 08ELC-17908.
-
Code enforcement Case HCEC-11-04191 Closed
The case was filed on 11/14/2011 but has since been closed without further action.
The city links this case to permit 08ELC-17908.
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE
- Permit
- 08ELC-17905
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $84
- Contractor
- E Tech Electrical
- Days from application to issue
- 10
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE
- Permit
- 08ELC-17906
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $84
- Contractor
- E Tech Electrical
- Days from application to issue
- 10
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE
- Permit
- 08ELC-17907
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $84
- Contractor
- E Tech Electrical
- Days from application to issue
- 10
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE
- Permit
- 08ELC-17908
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $84
- Contractor
- E Tech Electrical
- Days from application to issue
- 10
-
Permit Emergency Permit Application Acceptance - Approved No Review
HURRICANE DAMAGE REPAIR
- Permit
- 08COM-01272
- Type
- Emergency Permit
- Work
- NA
- Estimated cost (applicant’s figure)
- $120,000
- Fees
- $650
- Days from application to issue
- 5
-
Permit Construction Loop Application Acceptance - Approved
TEMP POLE
- Permit
- 08ELC-15972
- Type
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $60
- Contractor
- Malone Electrical
-
Permit Demolition Application Acceptance - Approved No Review
Demolition of hurricane damaged single residential unit. Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. A licensed plumber must secure a separate permit from the Sewage and Water Board to cap off sewer lines and remove water meters prior to demolition.
- Permit
- 07BLD-11300
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $29,520
- Fees
- $225
- Contractor
- New Orleans Demolition, New Orleans Demolition
- Days from application to issue
- 5