Read Blvd West
4635 Longfellow Drive is in Read Blvd West, zoned S-RS (Newer neighborhoods, single-family homes). The city has 8 permits on record here; the most recent, a mechanical fuel gas permit, was filed in November 2023. 1 is still open. A demolition permit was filed in February 2011. A building here was demolished under the NORA program, completed in June 2011. There were 3 past code enforcement cases, the latest in September 2012, all closed. On this block in the past year: 28 requests to 311 and 12 calls to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 5,744 sq ft
- Parcel
- 41101100
Everything on record here
12 records, newest first · 1 open
-
Permit Mechanical Fuel Gas Permit Finaled
RUN GAS FOR 1 STOVE AND 1 50GAL ELECTRIC WATER HEATER.
- Permit
- 23-30390-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $1,500
- Fees
- $35
- Days from application to issue
- 89
- Expires
- Jul 31, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
4 ton Electric system installed with ductwork
- Permit
- 23-29924-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $8,500
- Fees
- $68
- Days from application to issue
- 3
- Expires
- May 3, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Plumbing Permit Permit Finaled
Rough in waste, vent, and hot & cold water lines for: • 2 toilets • 3 lavatories • 2 bathtubs • 1 kitchen sink, garbage disposal, dishwasher • 1 washing machine • 1 a/c drain • 1 pot filler • Hose bibs • Icemaker box for refrigerator
- Permit
- 23-28893-PLMB
- Type
- Plumbing Permit
- Work
- Plumbing Permit
- Estimated cost (applicant’s figure)
- $0
- Fees
- $120
- Contractor
- Danny Griffin
- Days from application to issue
- 14
- Expires
- May 2, 2024
-
Permit Construction Loop Permit Finaled
temp pole
- Permit
- 23-26600-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $500
- Fees
- $40
- Contractor
- Perry Joseph Becnel
- Days from application to issue
- 1
- Expires
- Mar 28, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Finaled
New construction wire, service, meter panel, indoor 125 amp panel 15 circuits
- Permit
- 23-26602-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $7,250
- Fees
- $123
- Contractor
- Perry Joseph Becnel
- Days from application to issue
- 1
- Expires
- Mar 28, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Driveway/ Curb Cut and Restoration Other
New construction driveway
- Permit
- 23-23417-RDRV
- Type
- Driveway/ Curb Cut and Restoration
- Work
- Driveway/ Curb Cut and Restoration
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Contractor
- Jade Dabney dba Lavender Jade LLC, Shepherd Dabney Jade
-
Permit New Construction Occupancy
New single family construction
- Permit
- 23-21245-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $175,000
- Fees
- $1,110
- Contractor
- Jade Dabney
- Days from application to issue
- 47
- Expires
- Mar 19, 2024
- Application submitted
- Zoning review
- Application review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 12-10307-PNBL Closed
The case was filed on 09/28/2012 but has since been closed without further action.
The city links this case to permit 23-30390-FGAS.
-
Demolition NORA demolition Completed
- Program
- NORA
- Units
- 1
- Started
- May 25, 2011
- Completed
- Jun 17, 2011
Source: data.nola.gov BlightStatus demolitions (2009–2019, no longer updated)
-
Permit Demolition Permit Issuance - Active
DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.
- Permit
- 11BLD-01687
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $145
- Days from application to issue
- 0
-
Code enforcement Case HCES-11-00510 Closed
The property was inspected on 02/03/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.
- Inspection: Inspection Violation Unoccupied
The city links this case to permit 23-30390-FGAS.
-
Code enforcement Case ENVHADJ-2007277EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 23-30390-FGAS.