Plum Orchard

4441 Laine Avenue is in Plum Orchard, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 1 permit on record here; the most recent, a residential permit, was filed in October 2011. 1 is still open. A building here was demolished under the NORA program, completed in December 2011. There are 2 open code enforcement cases. On this block in the past year: 14 requests to 311 and 4 calls to police.

Zoning
S-RD
Historic district
None
Council district
E
Ward
9
Lot size
7,064 sq ft
Parcel
41101295

Everything on record here

4 records, newest first · 3 open

  1. Code enforcement Case 24-11393-MPM Judgment

    A hearing was held on 04/02/2025 with a result of "Guilty: Abated".

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Violation: 157 Sanitation
    2. Violation: 160 Weeds and Plant Growth
    3. Violation: 161 Rodent Harborage
    4. Violation: 163 Accessory Structures
    5. Violation: 163 Fences and Walls
    6. Violation: 164 Motor Vehicles
    7. Violation: 168 Premises Identification
    8. Inspection: Inspection Violation: No WIP
    9. Inspection: Posting of Hearing Notice Violation: No WIP
    10. Hearing: Initial Hearing Guilty: Abated

    The city links this case to permit 11BLD-06887.

  2. Code enforcement Case 24-00476-MPM Judgment

    A hearing was held on 08/05/2024 with a result of "Guilty".

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Driveways
    4. Violation: 159 Sidewalks
    5. Violation: 160 Weeds and Plant Growth
    6. Violation: 161 Rodent Harborage
    7. Violation: 163 Accessory Structures
    8. Violation: 163 Fences and Walls
    9. Violation: 164 Motor Vehicles
    10. Violation: 165 Defacement of Property
    11. Violation: 167 Exterior Surfaces
    12. Violation: 167 Paint or Protective Treatment
    13. Violation: 167 Siding and Masonry
    14. Violation: 167 Metal Surfaces
    15. Violation: 168 Premises Identification
    16. Violation: 169 Structure
    17. Violation: 169 Upright Boards/Framing
    18. Violation: 169 Studs
    19. Violation: 171 Exterior Walls
    20. Violation: 172 Roofs
    21. Inspection: Posting of Hearing Notice Violation: No WIP
    22. Hearing: Initial Hearing Reset: Owner Legal Issue
    23. Inspection: Reinspection Violation: No WIP
    24. Hearing: Reset Hearing Guilty
    25. Violation: 157 Sanitation
    26. Violation: 159 Sidewalks
    27. Violation: 159 Driveways
    28. Violation: 160 Weeds and Plant Growth
    29. Violation: 161 Rodent Harborage
    30. Violation: 163 Accessory Structures
    31. Violation: 164 Motor Vehicles
    32. Violation: 168 Premises Identification
    33. Hearing: Reset Hearing Guilty

    The city links this case to permit 11BLD-06887.

  3. Demolition NORA demolition Completed
    Program
    NORA
    Units
    1
    Started
    Oct 12, 2011
    Completed
    Dec 22, 2011

    Source: data.nola.gov BlightStatus demolitions (2009–2019, no longer updated)

  4. Permit Residential Permit Issuance Active

    Demolish single family house to grade. Contractor shall remove and dispose of all debris within 72 hours of completion. Proof of disposal required at time of final inspection. Separate permit required from sewerage and water board to cap sewer lines and

    Permit
    11BLD-06887
    Type
    Residential
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $145