4729 Laine Avenue is in Plum Orchard, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 8 permits on record here; the most recent, a solar permit, was filed in March 2013. 7 are still open. A demolition permit was filed in August 2004. There were 7 past code enforcement cases, the latest in July 2009, all closed. On this block in the past year: 19 requests to 311 and 19 calls to police.
- Zoning
- S-RD
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 11,282 sq ft
- Parcel
- 41101710
Everything on record here
15 records, newest first · 7 open
-
Permit Solar Permit Issued
SOLAR PANELS- 13-03225
- Permit
- 13-06770-SOLR
- Type
- Solar
- Work
- Solar
- Estimated cost (applicant’s figure)
- $0
- Fees
- $52
- Contractor
- Rhyon John Kendrick
- Days from application to issue
- 0
- Expires
- Sep 5, 2013
-
Permit Renovation (Non-Structural) Certificate of Occupancy
INSTALL SOLAR PANELS.
- Permit
- 13-03225-RNVN
- Type
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $25,000
- Fees
- $185
-
Permit General Mechanical Inspection - Completed
INSTALL ELEC WATER HEATER. NOEL IRSCH (#2222)
- Permit
- 10MCH-05968
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $20
- Contractor
- Noel's Plumbing
- Days from application to issue
- 5
-
Permit General Mechanical Application Acceptance - Approved
INSTALL ELEC WAF AND A\C. #10BLD-01274 ERNEST REA (#13522)
- Permit
- 10MCH-04359
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $65
- Contractor
- Rea Air Cond & Htg
- Days from application to issue
- 5
-
Permit Construction Loop Permit Issuance - Active
TEMP POLE- 10BLD-01274
- Permit
- 10ELC-02401
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Eddie J. Freeman
- Days from application to issue
- 0
-
Permit Electrical Permit Issuance Active
NEW CONSTRUCTION- 10BLD-001274
- Permit
- 10ELC-02402
- Type
- Electrical
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $160
-
Permit New Construction Inspection - Completed No Requirements
NEW CONSTRUCTION OF A 1 STORY 1040 SF FT SINGLE PER PLANS. RE-SUBDIVISION SHALL BE TIED TO THE C OF O.
- Permit
- 10BLD-01274
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $104,000
- Fees
- $684
- Days from application to issue
- 9
-
Code enforcement Case ENVHADJ-09-00721 Closed
A hearing was held on 08/24/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Vacant Lot
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 13-06770-SOLR.
-
Code enforcement Case ENVHADJ-9820HB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 13-06770-SOLR.
-
Code enforcement Case ENVHADJ-20002096HB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 13-06770-SOLR.
-
Code enforcement Case ENVHADJ-20024145PB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 13-06770-SOLR.
-
Code enforcement Case ENVHADJ-943039 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 13-06770-SOLR.
-
Code enforcement Case ENVHADJ-952757 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 13-06770-SOLR.
-
Code enforcement Case ENVHADJ-963547 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 13-06770-SOLR.
-
Permit Demolition Certificate of Occupancy - Issued No Meter
DEMOLISH RESIDENCE TO GRADE. DECLARED "PUBLIC NUISANCE" BY THE DIVISION OF HOUSING AND NEIGHBORHOOD DEVELOPMENT. ANY FURTHER CONSTRUCTION WILL REQUIRE A SEPARATE PERMIT.
- Permit
- 04BLD-01720
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $3,200
- Fees
- $95
- Days from application to issue