Plum Orchard
4601 Laine Avenue is in Plum Orchard, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 5 permits on record here; the most recent, a mechanical permit, was filed in September 2011. 5 are still open. A demolition permit was filed in June 2010. There were 2 past code enforcement cases, the latest in June 2018, all closed. On this block in the past year: 13 requests to 311 and 13 calls to police.
- Zoning
- S-RD
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 8,296 sq ft
- Parcel
- 41101727
Everything on record here
7 records, newest first · 5 open
-
Code enforcement Case 18-04746-MPM Closed
The property was inspected on 07/25/2018 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 11MCH-07745.
-
Code enforcement Case 12-10278-PNBL Closed
The case was filed on 09/28/2012 but has since been closed without further action.
The city links this case to permit 11MCH-07745.
-
Permit Mechanical Application Approved
ajm311, ck 2107 by 273-0932 waf ac
- Permit
- 11MCH-07745
- Type
- Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $70
-
Permit Electrical Permit Issuance Active
NEW CONSTRUCTION- 10BLD-05209
- Permit
- 10ELC-10960
- Type
- Electrical
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $190
-
Permit Construction Loop Permit Issuance - Active
TEMP POLE- 10BLD-05209
- Permit
- 10ELC-10961
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Brockhaus Electrical
- Days from application to issue
- 0
-
Permit New Construction Certificate of Occupancy - Issued w/Meter
NEW CONSTRUCTION OF A 1-STORY SINGLE FAMILY DWELLING AS PER PLANS.
- Permit
- 10BLD-05209
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $125,900
- Fees
- $816
- Days from application to issue
- 13
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLITION TO GRADE SINGLE RESIDENCE.CONTRACTOR IS REQUIRED TO REMOVE ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. A SEPERATE PERMIT IS REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINE AND REMOVE WATER METER. ANY FUTURE USE REQUIRES A SEPERATE PERMIT.
- Permit
- 10BLD-02985
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $3,200
- Fees
- $115
- Days from application to issue
- 5