Plum Orchard

4601 Laine Avenue is in Plum Orchard, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 5 permits on record here; the most recent, a mechanical permit, was filed in September 2011. 5 are still open. A demolition permit was filed in June 2010. There were 2 past code enforcement cases, the latest in June 2018, all closed. On this block in the past year: 13 requests to 311 and 13 calls to police.

Zoning
S-RD
Historic district
None
Council district
E
Ward
9
Lot size
8,296 sq ft
Parcel
41101727

Everything on record here

7 records, newest first · 5 open

  1. Code enforcement Case 18-04746-MPM Closed

    The property was inspected on 07/25/2018 with a finding of "No Violation". The file was subsequently closed.

    1. Inspection: Inspection No Violation

    The city links this case to permit 11MCH-07745.

  2. Code enforcement Case 12-10278-PNBL Closed

    The case was filed on 09/28/2012 but has since been closed without further action.

    The city links this case to permit 11MCH-07745.

  3. Permit Mechanical Application Approved

    ajm311, ck 2107 by 273-0932 waf ac

    Permit
    11MCH-07745
    Type
    Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $70
  4. Permit Electrical Permit Issuance Active

    NEW CONSTRUCTION- 10BLD-05209

    Permit
    10ELC-10960
    Type
    Electrical
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $190
  5. Permit Construction Loop Permit Issuance - Active

    TEMP POLE- 10BLD-05209

    Permit
    10ELC-10961
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Contractor
    Brockhaus Electrical
    Days from application to issue
    0
  6. Permit New Construction Certificate of Occupancy - Issued w/Meter

    NEW CONSTRUCTION OF A 1-STORY SINGLE FAMILY DWELLING AS PER PLANS.

    Permit
    10BLD-05209
    Type
    New Construction
    Work
    New
    Estimated cost (applicant’s figure)
    $125,900
    Fees
    $816
    Days from application to issue
    13
  7. Permit Demolition Application Acceptance - Approved No Review

    DEMOLITION TO GRADE SINGLE RESIDENCE.CONTRACTOR IS REQUIRED TO REMOVE ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. A SEPERATE PERMIT IS REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINE AND REMOVE WATER METER. ANY FUTURE USE REQUIRES A SEPERATE PERMIT.

    Permit
    10BLD-02985
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $3,200
    Fees
    $115
    Days from application to issue
    5