Read Blvd East

4755 Read Boulevard is in Read Blvd East, zoned S-RS (Newer neighborhoods, single-family homes). The city has 7 permits on record here; the most recent, a mechanical fuel gas permit, was filed in June 2022. 1 is still open. A demolition permit was filed in November 2009. There was 1 past code enforcement case, the latest in March 2019, all closed. On this block in the past year: 15 requests to 311 and 2 calls to police.

Zoning
S-RS
Historic district
None
Council district
E
Ward
9
Lot size
6,495 sq ft
Parcel
41103750

Everything on record here

8 records, newest first · 1 open

  1. Permit Mechanical Fuel Gas Permit Finaled

    New gas line. New water heater

    Permit
    22-17231-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $1,800
    Fees
    $40
    Days from application to issue
    6
    Expires
    Dec 15, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Rough-In/Rewire; New 200amp panel, New Service, New Feeder, Trim-Out; receptacles, switches, plate covers, fixtures

    Permit
    21-35967-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $11,450
    Fees
    $166
    Contractor
    Troy D Porter
    Days from application to issue
    18
    Expires
    Jul 18, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Mechanical HVAC Permit Finaled

    Install 5 ton HVAC system with 15KW heat strip and condenser

    Permit
    21-35966-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $9,000
    Fees
    $76
    Days from application to issue
    11
    Expires
    Jul 11, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Construction Loop Permit Finaled

    Temp Pole

    Permit
    21-22738-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $800
    Fees
    $40
    Contractor
    Troy D Porter
    Days from application to issue
    5
    Expires
    Feb 9, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit New Construction Occupancy

    New construction of single family resident

    Permit
    20-44265-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $165,000
    Fees
    $1,050
    Contractor
    Troy D Porter
    Days from application to issue
    14
    Expires
    May 18, 2021
    1. Application submitted
    2. Zoning review
    3. Plan review
    4. Application review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  6. Permit New Construction Other

    New Construction of aS1 story 1912sf Single Family per plans.

    Permit
    20-37928-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $191,200
    Fees
    $1,212
    Contractor
    Porter Development Unlimited, LLC
    1. Application submitted
    2. Application review

    See this permit on One Stop

  7. Code enforcement Case 19-01895-MPM Closed

    The property was inspected on 07/03/2019 with a finding of "No Violation". The file was subsequently closed.

    1. Inspection: Inspection No Violation

    The city links this case to permit 22-17231-FGAS.

  8. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.

    Permit
    09BLD-06759
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Contractor
    Camp Dresser & Mckee
    Days from application to issue
    5