Read Blvd East

4711 Sierra Madre Drive is in Read Blvd East, zoned S-RS (Newer neighborhoods, single-family homes). The city has 4 permits on record here; the most recent, a renovation (non-structural) permit, was filed in January 2025. 2 are still open. On this block in the past year: 6 requests to 311 and 4 calls to police.

Zoning
S-RS
Historic district
None
Council district
E
Ward
9
Lot size
5,866 sq ft
Parcel
41103955

Everything on record here

4 records, newest first · 2 open

  1. Permit Renovation (Non-Structural) Permit Cancelled

    Install a 10.250 kW PV Solar system

    Permit
    25-02529-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $15,375
    Fees
    $200
    Contractor
    Edison Solar
    1. Application submitted

    See this permit on One Stop

  2. Permit Solar Permit Issued

    Install a 10.250 kW PV Solar system

    Permit
    25-02528-SOLR
    Type
    Solar
    Work
    Solar
    Estimated cost (applicant’s figure)
    $15,375
    Fees
    $40
    Contractor
    Ephriam Goss
    Days from application to issue
    87
    Expires
    Oct 21, 2025

    See this permit on One Stop

  3. Permit Electrical Repair / Replacement / Addition Permit Cancelled

    Install a 10.25KW PV system

    Permit
    24-32331-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $61
    Contractor
    Ephriam Goss
    1. Application submitted

    See this permit on One Stop

  4. Permit Renovation (Non-Structural) Permit Issued

    Installation of New Solar Panels on Roof

    Permit
    24-24024-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $57,483
    Fees
    $410
    Contractor
    Edison Solar Limited Liability Company
    Days from application to issue
    203
    Expires
    Aug 24, 2025
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop