Dillard
4105 Rayne Drive is in Dillard, zoned S-RS (Newer neighborhoods, single-family homes). The city has 10 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in December 2015. 8 are still open. A demolition permit was filed in April 2007. There is 1 open code enforcement case. On this block in the past year: 8 requests to 311 and 7 calls to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- D
- Ward
- 7
- Lot size
- 5,307 sq ft
- Parcel
- 41106070
Everything on record here
11 records, newest first · 9 open
-
Code enforcement Case 26-12495-MPM Inspection
The case was filed on 11/02/2026 and the property is awaiting inspection to proceed further.
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
The city links this case to permit 15-35795-SERV.
-
Permit Electrical Service / Circuit / Feeder Permit Finaled
RE-WIRE 13-07500-RNVN
- Permit
- 15-35795-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $0
- Fees
- $145
- Contractor
- Zoltan G. Harmos
- Days from application to issue
- 0
- Expires
- Jun 1, 2016
-
Permit Construction Loop Permit Issued
TEMP POLE 13-07500-RNVN
- Permit
- 15-14530-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Zoltan G. Harmos
- Days from application to issue
- 20
- Expires
- Dec 2, 2015
-
Permit Renovation (Non-Structural) Permit Issued
supplement to 07BLD-03925 to complete repairs - electrical and plumbing.
- Permit
- 13-07500-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $175
- Days from application to issue
- 0
- Expires
- Sep 11, 2013
-
Permit General Mechanical Application Acceptance - Approved
INSTALL 4-TON A\C AND ELEC WAF . GEORGE BRAM (#1636)
- Permit
- 10MCH-01959
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $73
- Contractor
- Any Degrees A/C & Heat LLC
- Days from application to issue
- 5
-
Permit Construction Loop Application Acceptance - Approved
TEMP POLE
- Permit
- 09ELC-05785
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Jeffrey C. Genna
- Days from application to issue
- 10
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE
- Permit
- 09ELC-03142
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $141
- Contractor
- Jeffrey C. Genna
- Days from application to issue
- 10
-
Permit General Mechanical Meter Release - Released
INSTALL GAS W\H AND METER OUT OVER 6-MOS. ISAIAH BYRD (#478)
- Permit
- 08MCH-07868
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $50
- Contractor
- Byrd Plbg.& A/C Inc.
- Days from application to issue
- 5
-
Permit Emergency Permit Permit Issued
Work Descripton: Hurricane damage to single family dwelling Historical Import Type: Permits Residential Single (One-Family Unit) Emergency Permit User: LFRANCOIS Tracking: Status: Permit Issuance Active Status Date: 4/17/2007 12:00:00 AM Owner: Alcide R Lavigne Owner Address: 4818 Bayou Bend Ct, Alexander, LA 71303 Owner Phone: Owner Edited By: 4/17/2007 by LFRANCOIS
- Permit
- 07BLD-03925
- Type
- Emergency Permit
- Work
- Emergency Permit
- Estimated cost (applicant’s figure)
- $45,000
- Fees
- $275
- Days from application to issue
- 2486
-
Permit Residential
HURRICANE DAMAGE REPAIRS TO INCLUDE: FLOORS, SHEETROCK, ROOF, PLUMBING, ELECTRICAL AND OTHER REPAIRS AS NEEDED TO MAKE THE HOME LIVEABLE.
- Permit
- 07BLD-03040
- Type
- Residential
- Work
- Emergency Permit
- Estimated cost (applicant’s figure)
- $50,000
- Fees
- $300
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION.
- Permit
- 07BLD-03042
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $100
- Days from application to issue
- 5