Filmore
1511 Harrison Avenue is in Filmore, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 5 permits on record here; the most recent, a mechanical HVAC permit, was filed in February 2020. 2 are still open. There were 3 past code enforcement cases, the latest in May 2016, all closed. On this block in the past year: 7 requests to 311 and 21 calls to police.
- Zoning
- S-RD
- Historic district
- None
- Council district
- D
- Ward
- 7
- Lot size
- 4,180 sq ft
- Parcel
- 41107739
Everything on record here
8 records, newest first · 2 open
-
Permit Mechanical HVAC Permit Finaled
install 4 ton split system
- Permit
- 20-20390-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $0
- Fees
- $68
- Contractor
- Thomas Hung T Nguyen
- Days from application to issue
- 0
- Expires
- Aug 28, 2020
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Issued
Install new 95' pipe gas 4-outlets, gas stove, gas dryer, a/c furnance and one tankless gas water heater.
- Permit
- 20-04719-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $0
- Fees
- $35
- Contractor
- Miguel Rivera
- Days from application to issue
- 0
- Expires
- Aug 24, 2020
- Issue date
- Application submitted
- Application review
- Permit approved
-
Permit Construction Loop Permit Issued
Construction Loop
- Permit
- 20-04725-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Miguel Rivera
- Days from application to issue
- 267
- Expires
- May 16, 2021
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Wiring for new construction including a 200 amp service with 18 circuits
- Permit
- 20-04726-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $0
- Fees
- $154
- Contractor
- Miguel Rivera
- Days from application to issue
- 267
- Expires
- May 16, 2021
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit New Construction Permit Issued
New construction of a 1737sq ft single family dwelling
- Permit
- 20-04256-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $145,600
- Fees
- $1,098
- Days from application to issue
- 183
- Expires
- Feb 18, 2021
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
-
Code enforcement Case 16-04199-MPM Closed
A hearing was held on 08/11/2016 with a result of "Dismissed Legal Issue". The case was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Inspection: Posting of Hearing Notice Violation: WIP
- Hearing: Initial Hearing Dismissed Legal Issue
The city links this case to permit 20-20390-HVAC.
-
Code enforcement Case ENVHADJ-20001317EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 20-20390-HVAC.
-
Code enforcement Case ENVHADJ-20004078EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 20-20390-HVAC.