Gentilly Woods
4530 Congress Drive is in Gentilly Woods, zoned S-RS (Newer neighborhoods, single-family homes). The city has 10 permits on record here; the most recent, a driveway/ curb cut and restoration permit, was filed in February 2020. 4 are still open. A demolition permit was filed in November 2010. There were 2 past code enforcement cases, the latest in June 2017, all closed. On this block in the past year: 5 requests to 311 and 0 calls to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- D
- Ward
- 9
- Lot size
- 5,772 sq ft
- Parcel
- 41109808
Everything on record here
12 records, newest first · 4 open
-
Permit Sidewalk Repair Other
4 ft by 52 ft
- Permit
- 20-04065-RSWR
- Type
- Sidewalk Repair
- Work
- Sidewalk Repair
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 339
- Expires
- Jul 20, 2021
-
Permit Driveway/ Curb Cut and Restoration Other
- Permit
- 20-40174-RDRV
- Type
- Driveway/ Curb Cut and Restoration
- Work
- Driveway/ Curb Cut and Restoration
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
-
Permit Mechanical HVAC Permit Issued
Install a new 3 1/2 ton a/c and heat system with al assoiated duct work.
- Permit
- 20-03374-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $0
- Fees
- $68
- Contractor
- Armand Duvio, Jr.
- Days from application to issue
- 0
- Expires
- Aug 10, 2020
- Issue date
- Application submitted
- Application review
- Permit approved
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Wire House
- Permit
- 20-03011-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $0
- Fees
- $172
- Contractor
- Michael Jonathan Lee
- Days from application to issue
- 0
- Expires
- Aug 5, 2020
- Issue date
- Application submitted
- Application review
- Permit approved
- First inspection
-
Permit Construction Loop Permit Issued
Temporary pole
- Permit
- 19-70009-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $800
- Fees
- $40
- Contractor
- Michael Jonathan Lee
- Days from application to issue
- 0
- Expires
- Jun 16, 2020
- Issue date
- Application submitted
- Application review
- Permit approved
-
Permit Mechanical Fuel Gas Permit Finaled
Run gas for 1 stove and 1 lantern. Install 1 electric w/h.
- Permit
- 19-38292-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $1,000
- Fees
- $35
- Days from application to issue
- 107
- Expires
- Sep 19, 2020
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit New Construction Occupancy
New construction of a single family dwelling with 3 bedrooms and 2 bathrooms. Living sqft 1618 and total 1773 sq ft.
- Permit
- 19-38186-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $129,836
- Fees
- $840
- Contractor
- Cojoe Homes LLC
- Days from application to issue
- 10
- Expires
- Jun 12, 2020
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 17-07734-MPM Closed
The case was filed on 06/23/2017 but has since been closed without further action.
The city links this case to permit 20-04065-RSWR.
-
Code enforcement Case 15-04813-MPM Closed
The property was inspected on 06/26/2015 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 20-04065-RSWR.
-
Permit Demolition Inspection - Completed No Requirements
Demolition to grade of a slab. Contractor is required to remove all debris within 72 hours of completion.
- Permit
- 10BLD-06494
- Type
- Demolition
- Estimated cost (applicant’s figure)
- $1,000
- Fees
- $100
- Days from application to issue
- 0
-
Permit Demolition Certificate of Occupancy - Issued No Meter
DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FORM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS. SLAB AND DRIVEWAY REMAIN ON LOT. CORP JOB.
- Permit
- 07BLD-09858
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Days from application to issue
- 5
-
Permit Electrical
ELECTRICAL EMERGENCY RECONN - AFTER HRS. SINGLE-FAMILY DWELLING ROBERT MANGIPANO
- Permit
- E01001955
- Type
- Electrical
- Days from application to issue
- 22