Read Blvd East

5901 Read Boulevard is in Read Blvd East, zoned C-3 (Heavy commercial, auto-oriented, for large shopping centers). The city has 9 permits on record here; the most recent, an attached sign permit, was filed in January 2024. 5 are still open. There were 5 past code enforcement cases, the latest in September 2012, all closed. On this block in the past year: 2 requests to 311 and 60 calls to police.

Zoning
C-3
Historic district
None
Council district
E
Ward
9
Lot size
30,175 sq ft
Parcel
41114583

Everything on record here

14 records, newest first · 5 open

  1. Permit Attached Sign Permit Issued

    Hanging 2-->34.90" X 37.50" Pecten Signs on a Canopy over gas pumps

    Permit
    24-00723-SATT
    Type
    Attached Sign
    Work
    Attached Sign
    Estimated cost (applicant’s figure)
    $0
    Fees
    $835
    Contractor
    Chapman Canopy, Inc
    Days from application to issue
    42
    Expires
    Aug 20, 2024
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  2. Permit Accessory Structure Permit Issued

    Building a 42'Wide X 76'Long Canopy over gas pumps

    Permit
    24-00705-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $103,788
    Fees
    $734
    Contractor
    Chapman Canopy, Inc
    Days from application to issue
    29
    Expires
    Aug 7, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  3. Permit Hoods Permit Finaled

    Hood Installation

    Permit
    23-33298-HOOD
    Type
    Hoods
    Work
    Hoods
    Estimated cost (applicant’s figure)
    $0
    Fees
    $50
    Contractor
    Ammar Diri
    Days from application to issue
    29
    Expires
    Jul 3, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Mechanical Fuel Gas Permit Finaled

    Install a gas line for 3 fryers and 1 grill.

    Permit
    23-33075-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $4,500
    Fees
    $100
    Days from application to issue
    2
    Expires
    Jun 4, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Mechanical Fuel Gas Permit Cancelled

    6 month gas test

    Permit
    23-32455-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $575
    Fees
    $30
    Days from application to issue
    1
    Expires
    May 28, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  6. Permit Electrical Service / Circuit / Feeder Permit Finaled

    wire for ice machine

    Permit
    21-29087-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $2,200
    Fees
    $118
    Contractor
    Mark Gerard Andrews Sr.
    Days from application to issue
    2
    Expires
    Apr 19, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  7. Permit Renovation (Non-Structural) Permit Issued

    Placement of a ice machine on a parking lot as per sketch and CPC Planning Approval.

    Permit
    21-03806-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $7,000
    Fees
    $95
    Contractor
    Paradigm Investments LLC
    Days from application to issue
    27
    Expires
    Jan 21, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  8. Code enforcement Case 12-10206-PNBL Closed

    The property was inspected on 09/26/2012 with a finding of "No Violation". The file was subsequently closed.

    1. Inspection: Inspection No Violation

    The city links this case to permit 24-00723-SATT.

  9. Code enforcement Case 12-08342-PNBL Closed

    The case was filed on 08/01/2012 but has since been closed without further action.

    The city links this case to permit 24-00723-SATT.

  10. Code enforcement Case CEHB-12-1364 Closed

    The property was inspected on 04/26/2012 with a finding of "Rescheduled". The file was subsequently closed.

    1. Inspection: Inspection Occupied

    The city links this case to permit 24-00723-SATT.

  11. Code enforcement Case HCEC-12-00831 Closed

    The case was filed on 04/26/2012 but has since been closed without further action.

    The city links this case to permit 24-00723-SATT.

  12. Code enforcement Case ENVHADJ-20012636F Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 24-00723-SATT.

  13. Permit Emergency Permit Application Acceptance - Approved No Review

    NON-STRUCTURAL REPAIRS TO HURRICANE DAMAGED COMMERCIAL BUILDING

    Permit
    06COM-01895
    Type
    Emergency Permit
    Work
    NA
    Estimated cost (applicant’s figure)
    $29,000
    Fees
    $195
    Days from application to issue
    5
  14. Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved

    RECONNECT

    Permit
    06ELC-02450
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Ekco Elec Contr
    Days from application to issue
    10