14850 Intracoastal Drive is in Viavant - Venetian Isles, zoned HI (Heavy industrial: higher-impact manufacturing and storage). The city has 8 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in February 2022. 5 are still open.
- Zoning
- HI
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 1,160,724 sq ft
- Parcel
- 41119511
Everything on record here
8 records, newest first · 5 open
-
Permit Electrical Service / Circuit / Feeder Permit Finaled
Install new 200 amp services with 4 circuits
- Permit
- 22-05412-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $2,500
- Fees
- $112
- Contractor
- Timothy J Carman
- Days from application to issue
- 14
- Expires
- Sep 4, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Accessory Structure Permit Issued
Tower Site Address on former building permit is 14850 Intracoastal Dr. Parcel # is 3-9W-9-645-19. Existing Carrier, T-Mobile/Sprint upgrading their antennas configuration on Crown Tower (BU 878666). Scope of work is: Remove existing equipment 6 replace with 3 new antennas, 1 HCS 2.0 integrated hybrid/COVPs & 6 RRUs; adding 2 HPL3 Battery / HPL3 Support cabinets on existing elevated platform.
- Permit
- 21-12196-ACCS
- Type
- Accessory Structure
- Work
- Accessory Structure
- Estimated cost (applicant’s figure)
- $48,691
- Fees
- $305
- Contractor
- EasTex Tower, LLC
- Days from application to issue
- 42
- Expires
- Dec 10, 2021
- Application submitted
- Zoning review
- Application review
- Plan review
- Permit approved
- Issue date
-
Permit Renovation (Non-Structural) Permit Finaled
Adding Antennas, RRUs, and Cables to an existing cell tower for SPRINT. The height of the tower will not change.
- Permit
- 18-07116-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $15,000
- Fees
- $135
- Contractor
- VINCO, Inc
- Days from application to issue
- 8
- Expires
- Sep 9, 2018
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Permit Renovation (Non-Structural) Permit Issued
Antenna colocation on existing wireless tower. No ground work. No electrical. No change in tower height.
- Permit
- 14-20168-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $15,000
- Fees
- $195
- Contractor
- Tower View
- Days from application to issue
- 32
- Expires
- Jan 29, 2015
-
Permit Renovation (Structural) Permit Issued
Install new fuel cell cabinet on the existing elevated platform and install storage module on the existing concrete pad under the platform within the compound per plans.
- Permit
- 12-23731-RNVS
- Type
- Renovation (Structural)
- Work
- Renovation (Structural)
- Estimated cost (applicant’s figure)
- $49,545
- Fees
- $370
- Days from application to issue
- 40
- Expires
- Apr 17, 2013
-
Permit Renovation (Non-Structural) Occupancy
Replace (4) existing antennas with (2) new antennas and replace existing ground equipment cabinets with new cabinets. (Sprint)
- Permit
- 12-21915-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $15,000
- Fees
- $135
- Contractor
- SBA Network Services,Inc
- Days from application to issue
- 0
- Expires
- Feb 15, 2013
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
cell site/ reconnect
- Permit
- 06ELC-09618
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Pumba
- Days from application to issue
- 10
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
reconnect
- Permit
- 06ELC-04846
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- ,
- Days from application to issue
- 10