2318 Flood Street is in Lower Ninth Ward, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 2 permits on record here; the most recent, a demolition permit, was filed in May 2007. 2 are still open. A demolition permit was filed in April 2007. There were 2 past code enforcement cases, the latest in January 2016, all closed. On this block in the past year: 8 requests to 311 and 2 calls to police.

Zoning
HU-RD2
Historic district
None
Council district
E
Ward
9
Lot size
4,638 sq ft
Parcel
41120887

Everything on record here

4 records, newest first · 2 open

  1. Code enforcement Case 16-00146-MPM Closed

    A hearing was held on 07/21/2016 with a result of "Dismissed Wrong Location". The case was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Sidewalks
    4. Violation: 160 Weeds and Plant Growth
    5. Violation: 161 Rodent Harborage
    6. Inspection: Posting of Hearing Notice No Violation
    7. Hearing: Initial Hearing Dismissed Wrong Location

    The city links this case to permit 07BLD-04651.

  2. Code enforcement Case ENVHADJ-09-02271 Closed

    A hearing was held on 11/09/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 07BLD-04651.

  3. Permit Demolition Inspection - Completed No Requirements

    DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION. OVER 70% (JAY C. NICKELL)

    Permit
    07BLD-04651
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $75
  4. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH HOUSE TO GRADE. ALL DEBRIS SHALL BE REMOVED WITHIN 72 HOURS OF COMPLETION.

    Permit
    06BLD-06114
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Days from application to issue
    5