Lower Ninth Ward
1807 Delery Street is in Lower Ninth Ward, zoned S-RS (Newer neighborhoods, single-family homes). The city has 2 permits on record here; the most recent, a demolition permit, was filed in April 2007. 2 are still open. A demolition permit was filed in April 2007. There is 1 open code enforcement case. On this block in the past year: 4 requests to 311 and 1 call to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 2,594 sq ft
- Parcel
- 41121306
Everything on record here
6 records, newest first · 3 open
-
Code enforcement Case CEHB-11-1088 Judgment
A hearing was held on 10/25/2011 with a result of "Guilty: Public Nuisance".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation Unoccupied
- Inspection: Inspection Violation Posted No WIP
- Hearing: Initial Hearing Guilty: Public Nuisance
The city links this case to permit 07BLD-03407.
-
Code enforcement Case HCES-11-02702 Closed
The case was filed on 04/15/2011 but has since been closed without further action.
The city links this case to permit 07BLD-03407.
-
Code enforcement Case HCEC-10-00934 Closed
The case was filed on 05/13/2010 but has since been closed without further action.
- Inspection: Inspection Vacant Lot
The city links this case to permit 07BLD-03407.
-
Code enforcement Case ENVHADJ-20022215EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 07BLD-03407.
-
Permit Residential
DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP O
- Permit
- 07BLD-03405
- Type
- Residential
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
-
Permit Demolition Inspection - Completed No Requirements
DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION. OVER 70%
- Permit
- 07BLD-03407
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Days from application to issue
- 0