Lower Ninth Ward

1817 Delery Street is in Lower Ninth Ward, zoned S-RS (Newer neighborhoods, single-family homes). The city has 4 permits on record here; the most recent, a demolition permit, was filed in April 2007. 4 are still open. A demolition permit was filed in April 2007. There were 3 past code enforcement cases, the latest in September 2015, all closed. On this block in the past year: 4 requests to 311 and 1 call to police.

Zoning
S-RS
Historic district
None
Council district
E
Ward
9
Lot size
2,571 sq ft
Parcel
41121308

Everything on record here

7 records, newest first · 4 open

  1. Code enforcement Case 15-08691-MPM Closed

    The property was inspected on 09/24/2015 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Sidewalks
    4. Violation: 160 Weeds and Plant Growth
    5. Violation: 161 Rodent Harborage

    The city links this case to permit 07BLD-03411.

  2. Code enforcement Case CEHB-11-1086 Closed

    A hearing was held on 12/12/2011 with a result of "In Compliance Fees Due".

    1. Inspection: Inspection Violation Posted No WIP
    2. Hearing: Initial Hearing In Compliance Fees Due

    The city links this case to permit 07BLD-03411.

  3. Code enforcement Case HCEC-11-00870 Closed

    The case was filed on 03/18/2011 but has since been closed without further action.

    1. Inspection: Inspection Violation Unoccupied

    The city links this case to permit 07BLD-03411.

  4. Permit Demolition Inspection - Completed No Requirements

    DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION. OVER 70%

    Permit
    07BLD-03409
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $0
    Days from application to issue
    0
  5. Permit Demolition Inspection - Completed No Requirements

    DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION. OVER 70%

    Permit
    07BLD-03411
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Days from application to issue
    0
  6. Permit Electrical Repair / Replacement / Addition Inspection - Completed
    Permit
    04ELC-01092
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    3Rd Phase Electric Co
    Days from application to issue
    10
  7. Permit Electrical

    ELECTRICAL RECONNECT SINGLE-FAMILY DWELLING RECONNECT

    Permit
    E01002888
    Type
    Electrical
    Days from application to issue
    0