1730 Flood Street is in Lower Ninth Ward, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 10 permits on record here; the most recent, a general mechanical permit, was filed in August 2009. 10 are still open. A demolition permit was filed in August 2008. On this block in the past year: 11 requests to 311 and 13 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 3,587 sq ft
- Parcel
- 41121703
Everything on record here
10 records, newest first · 10 open
-
Permit General Mechanical Inspection - Completed
new gasline and gas w/heater; kevin ; ck#36020.
- Permit
- 09MCH-07428
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $35
- Contractor
- Carter & Sons
- Days from application to issue
- 5
-
Permit General Mechanical Inspection - Completed
new gasline and gas w/heater; kevin ; ck#36020.
- Permit
- 09MCH-07429
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $35
- Contractor
- Carter & Sons
- Days from application to issue
- 5
-
Permit General Mechanical Inspection - Completed
..SUPERIOR AIRE - SEPTIME ROME - - CK#20999 - WARM AIR FURN - A/C COND NEEDS WH/TEST PERMIT
- Permit
- 09MCH-04516
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $67
- Contractor
- Superior Aire
- Days from application to issue
- 5
-
Permit General Mechanical Inspection - Completed
..SUPERIOR AIRE - SEPTIME ROME - - CK#21000 - WARM AIR FURN - A/C COND
- Permit
- 09MCH-04517
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $67
- Contractor
- Superior Aire
- Days from application to issue
- 5
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
NEW CONSTRUCTION- RELEASED FROM BUILDING AND SENT TO ENTERGY 08/05/2009.
- Permit
- 09ELC-07403
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $98
- Contractor
- Evans Electrical Contractor
- Days from application to issue
- 10
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
NEW CONSTRUCTION- RELEASED FROM BUILDING AND SENT TO ENTERGY 08/05/2009.
- Permit
- 09ELC-07404
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $98
- Contractor
- Evans Electrical Contractor
- Days from application to issue
- 10
-
Permit Construction Loop Application Acceptance - Approved
TEMP POLE
- Permit
- 09ELC-05801
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Evans Electrical Contractor
- Days from application to issue
- 10
-
Permit New Construction Inspection - Completed
New construction of a 2 story double dwelling as per plans and Public Works Approval. Electrical,Hvac and Plumbing.
- Permit
- 09BLD-01158
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $120,000
- Fees
- $770
- Contractor
- Larry Trumbaturi
- Days from application to issue
- 21
-
Permit Demolition Inspection - Completed No Requirements
Demolition to grade of a 1 story double family dwelling as per Owner's request.Contractor shall remove and dispose of all debris within 72 hrs of completion.HCDRC approvals are needed before any work can be performed.Any futher use shall require a seperate permit.
- Permit
- 08BLD-04825
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $6,000
- Fees
- $105
- Days from application to issue
- 13
-
Permit Emergency Permit Application Acceptance - Approved No Review
REPAIRS TO AN EXISTING DOUBLE FAMILY (1730-32) TO INC: SHEETROCK, KITCHEN AND BATH CABINETS AND OTHER HURRICANE REPAIRS.
- Permit
- 05BLD-05220
- Type
- Emergency Permit
- Work
- Emergency Permit
- Estimated cost (applicant’s figure)
- $30,000
- Fees
- $200
- Days from application to issue
- 5