Lower Ninth Ward
1808 Forstall Street is in Lower Ninth Ward, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 7 permits on record here; the most recent, a solar permit, was filed in November 2014. 5 are still open. A demolition permit was filed in July 2007. On this block in the past year: 4 requests to 311 and 14 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 2,444 sq ft
- Parcel
- 41121821
Everything on record here
7 records, newest first · 5 open
-
Permit Solar Permit Issued
Solar - check meter
- Permit
- 14-34225-SOLR
- Type
- Solar
- Work
- Solar
- Estimated cost (applicant’s figure)
- $27,000
- Fees
- $52
- Days from application to issue
- 22
- Expires
- May 26, 2015
-
Permit Renovation (Non-Structural) Occupancy
Install 5.9 kW grid-tie solar pv system
- Permit
- 14-33985-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $27,000
- Fees
- $195
- Days from application to issue
- 1
- Expires
- May 4, 2015
-
Permit Electrical
rewire
- Permit
- 10ELC-08401
- Type
- Electrical
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $121
-
Permit Construction Loop Application Acceptance - Approved
TEMP POLE
- Permit
- 09ELC-02486
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- E-1 Electric Co
- Days from application to issue
- 10
-
Permit New Construction Plan Review - Completed
NEW CONSTRUCTION OF A 1 STORY 1128 SF SINGLE PER PLANS. PARKING NOT ALLOWED IN THE REQUIRED FRONT YARD.
- Permit
- 08BLD-08622
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $65,000
- Fees
- $440
- Days from application to issue
- 11
-
Permit Construction Loop Application Acceptance - Approved
TEMP POLE
- Permit
- 08ELC-15529
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- E-1 Electric
- Days from application to issue
- 10
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLISH HURRICANE DAMAGED SINGLE TO GRADE AS PER OWNER’S REQUEST. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWERAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METERS PRIOR TO DEMOLITION. ANY FURTHER USE SHALL REQUIRE A SEPARATE PERMIT.
- Permit
- 07BLD-07125
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Days from application to issue
- 5