Lower Ninth Ward
1521 Andry Street is in Lower Ninth Ward, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 7 permits on record here; the most recent, a demolition permit, was filed in June 2010. 6 are still open. A demolition permit was filed in June 2010. There were 3 past code enforcement cases, the latest in September 2009, all closed. On this block in the past year: 6 requests to 311 and 10 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 3,354 sq ft
- Parcel
- 41122579
Everything on record here
10 records, newest first · 6 open
-
Permit Demolition Inspection - Completed No Requirements
Supplement to correct the records for permit #08BLD-04751.Demolition to grade of a double family dwelling.(1521-1523) Contractor is required to remove all debris within 72 hours of completion. a seperate permit is required from sewage and water board to cap sewer line and remove meter.
- Permit
- 10BLD-03374
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $95
- Days from application to issue
- 5
-
Permit Mechanical Closed
matt haydel - 913-3467 - ck #-9923 = 1- electric waf 1-a/c cond.
- Permit
- 10MCH-00586
- Type
- Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $65
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
MODULAR HOME- PICTURES OF INSIDE PANELAND 3RD PARTY INSPECTION CERTIFICATE PROVIDED AT TIME OF FILING. SEE ATTACHED. 09BLD-05742- RELEASED FROM BUILDING AND SENT TO ENTERGY 01/28/2010.
- Permit
- 09ELC-17929
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $90
- Contractor
- Shannon L. Dice
- Days from application to issue
- 10
-
Permit New Construction Inspection - Completed
NEW CONSTRUCTION OF A 1-STRY, 1300 SQ FT SINGLE FAMILY MODULAR RESIDENCE AS PER PLANS. NO DRIVEWAY REQUIRED AS PER 15.6.7, NO PARKING WITHIN REQUIRED FRONT-YARD SETBACK. FRONT-YARD SETBACK 25'.
- Permit
- 09BLD-05742
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $65,000
- Fees
- $440
- Contractor
- Rcs Enterprises, LLC
- Days from application to issue
- 16
-
Code enforcement Case ENVHADJ-09-01938 Closed
The case was filed on 09/11/2009 but has since been closed without further action.
The city links this case to permit 10BLD-03374.
-
Code enforcement Case ENVHADJ-09-00558 Closed
A hearing was held on 08/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Adjudication Fast Track
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 10BLD-03374.
-
Code enforcement Case ENVHADJ-20042143EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 10BLD-03374.
-
Permit Demolition Inspection - Completed No Requirements
DEMOLISH TWO FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS. NCDC APPROVED
- Permit
- 08BLD-04751
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Contractor
- Drc Emergency Servces,Llc, Drc Emergency Servces,Llc
- Days from application to issue
- 5
-
Permit Demolition Certificate of Occupancy - Issued No Meter
DEMOLITION OF HURRICANE DAMAGED SINGLE RESIDENTIAL UNIT. CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND TO HAVE A FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METERS PRIOR TO DEMOLITION. 1521-23 ANDRY
- Permit
- 07BLD-10400
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $2,000
- Fees
- $85
- Days from application to issue
- 5
-
Permit Construction Loop Inspection - Completed
temp power
- Permit
- 05ELC-02847
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Days from application to issue
- 10