Lower Ninth Ward
6316 North Prieur Street is in Lower Ninth Ward, zoned S-RS (Newer neighborhoods, single-family homes). The city has 8 permits on record here; the most recent, a mechanical permit, was filed in August 2011. 8 are still open. A demolition permit was filed in October 2006. There was 1 past code enforcement case, the latest in April 2009, all closed. On this block in the past year: 0 requests to 311 and 3 calls to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 6,115 sq ft
- Parcel
- 41123161
Everything on record here
9 records, newest first · 8 open
-
Permit Mechanical Certificate Issued No Meter
A MARENGO 628-4517 WH CK#11630
- Permit
- 11MCH-06769
- Type
- Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $20
-
Permit Mechanical Certificate Issued No Meter
G NAVE 966-6061 WAF/AC/WH CK#5551
- Permit
- 11MCH-06709
- Type
- Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $85
-
Permit Electrical Permit Issuance Active
REWIRE- 11BLD-01151- TAKE OVER JOB FROM TOMMIE ZENON WHO IS NO LONGER AFFILIATED WITH THIS ADDRESS AS PER OWNER EFFECTIVE 08/10/2011. SEE ATTACHED.
- Permit
- 11ELC-08651
- Type
- Electrical
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $166
-
Permit Construction Loop Permit Issuance - Active
TEMP POLE- 11BLD-01151
- Permit
- 11ELC-03306
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Jay Dove
- Days from application to issue
- 0
-
Permit Electrical Service / Circuit / Feeder Permit Issuance - Active
REWIRE & LOW VOLTAGE- 11BLD-01151
- Permit
- 11ELC-03307
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $160
- Contractor
- Jay Dove
- Days from application to issue
- 0
-
Permit Renovation (Non-Structural) Certificate of Occupancy - Issued w/Meter
Supplement to complete work started under 09BLD-05313: Single Family Dwelling.
- Permit
- 11BLD-01151
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $1,000
- Fees
- $65
- Days from application to issue
- 0
-
Permit New Construction Plan Review - Completed
NEW CONSTRUCTION OF A 1-STORY SINGLE FAMILY DWELLING AS PER PLANS.
- Permit
- 09BLD-05313
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $117,000
- Fees
- $752
- Days from application to issue
- 13
-
Code enforcement Case ENVHADJ-20011719EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Permit Demolition Certificate of Occupancy - Issued No Meter
Demolish Structure to grade. All permits issued for demolition require the Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection.
- Permit
- 06BLD-10102
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125