Lower Ninth Ward
2100 Fats Domino Avenue is in Lower Ninth Ward, zoned HU-MU (Older neighborhoods, walkable mix of shops with homes above). The city has 3 permits on record here; the most recent, a residential permit, was filed in October 2011. 3 are still open. A demolition permit was filed in October 2009. A building here was demolished under the FEMA program, completed in June 2012. There is 1 open code enforcement case.
- Zoning
- HU-MU
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 8,125 sq ft
- Parcel
- 41123212
Everything on record here
8 records, newest first · 4 open
-
Demolition FEMA demolition Completed
- Program
- FEMA
- Units
- 1
- Started
- Jun 15, 2012
- Completed
- Jun 27, 2012
Source: data.nola.gov BlightStatus demolitions (2009–2019, no longer updated)
-
Permit Residential Permit Issuance Active
Demolish single family house to grade. Contractor shall remove and dispose of all debris within 72 hour of completion. Proof of disposal is required at time of final inspection. Separate permit required by sewerage and water board to cap sewer lines and
- Permit
- 11BLD-07331
- Type
- Residential
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $145
-
Code enforcement Case CEHB-11-5072 Judgment
A hearing was held on 09/08/2011 with a result of "Guilty: Public Nuisance Blight".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation Unoccupied
- Inspection: Inspection Violation Posted No WIP
- Hearing: Initial Hearing Guilty: Public Nuisance Blight
The city links this case to permit 11BLD-07331.
-
Code enforcement Case HCES-11-04578 Closed
The property was inspected on 05/31/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.
The city links this case to permit 11BLD-07331.
-
Code enforcement Case HCES-11-04536 Closed
The case was filed on 05/31/2011 but has since been closed without further action.
The city links this case to permit 11BLD-07331.
-
Permit Demolition Permit Issuance - Active
DEMOLITION TO GRADE COMMERCIAL MIXED-USE BUILDING.CONTRACTOR IS REQUIRED TO REMOVE ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. A SEPERATE PERMIT IS REQUIRED FROM SEWAGE AND WATER BOARD TO REMOVE WATER METER AND CAP SEWER LINE.
- Permit
- 09COM-00934
- Type
- Demolition
- Work
- NA
- Estimated cost (applicant’s figure)
- $24,000
- Fees
- $195
- Days from application to issue
- 18
-
Code enforcement Case ENVHADJ-94448 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 11BLD-07331.
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLISH COMMERCIAL BUILDING TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARTE PERMIT REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS. NCDC APPROVED WORK ORDER 2069.
- Permit
- 09COM-00204
- Type
- Demolition
- Work
- NA
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Contractor
- , Drc Emergency Servces,Llc
- Days from application to issue
- 5