2240 Alabo Street is in Lower Ninth Ward, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 5 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in June 2007. 5 are still open. A demolition permit was filed in September 2006. On this block in the past year: 2 requests to 311 and 3 calls to police.

Zoning
HU-RD2
Historic district
None
Council district
E
Ward
9
Lot size
3,789 sq ft
Parcel
41123813

Everything on record here

5 records, newest first · 5 open

  1. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    2240 ALABO (RECONN / REWIRE)

    Permit
    07ELC-16158
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $135
    Days from application to issue
    10
  2. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    2242 ALABO (RECONN / REWIRE)

    Permit
    07ELC-16160
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $135
    Days from application to issue
    10
  3. Permit Residential

    NEW CONSTRUCTION OF A TWO FAMILY, ONE STORY DWELLING AS PER SKETCH.

    Permit
    07BLD-00680
    Type
    Residential
    Work
    New
    Estimated cost (applicant’s figure)
    $98,000
    Fees
    $540
  4. Permit New Construction Certificate of Occupancy - Issued w/Meter

    NEW CONSTRUCTION OF A TWO FAMILY (2242-40), ONE STORY DWELLING AS PER SKETCH.

    Permit
    07BLD-00682
    Type
    New Construction
    Work
    New
    Estimated cost (applicant’s figure)
    $98,000
    Fees
    $540
    Days from application to issue
    5
  5. Permit Demolition Certificate of Occupancy - Issued No Meter

    DEMOLISH HURRICANE DAMAGED DOUBLE(2240-42) TO GRADE. SUBSTANTIALLY DAMAGED BY HURRICANE KATRINA(74.14%). A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWERAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METERS PRIOR TO DEMOLITION. ANY FURTHER USE SHALL REQUIRE A SEPARATE PERMIT.

    Permit
    06BLD-08365
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $7,800
    Fees
    $115
    Days from application to issue
    5