Lower Ninth Ward

1739 Saint Maurice Avenue is in Lower Ninth Ward, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 2 permits on record here; the most recent, a demolition permit, was filed in October 2006. 2 are still open. A demolition permit was filed in October 2006. There is 1 open code enforcement case. On this block in the past year: 4 requests to 311 and 11 calls to police.

Zoning
HU-RD2
Historic district
None
Council district
E
Ward
9
Lot size
3,336 sq ft
Parcel
41124242

Everything on record here

5 records, newest first · 3 open

  1. Code enforcement Case 26-02712-MPM Hearing

    The file has been processed and reviewed by a title examiner and is awaiting scheduling for a hearing.

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Sidewalks
    4. Violation: 160 Weeds and Plant Growth
    5. Inspection: CE Compliance Inspection Complete

    The city links this case to permit 06BLD-09786.

  2. Code enforcement Case 16-03246-MPM Closed

    A hearing was held on 06/07/2016 with a result of "Dismissed Wrong Location". The case was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Sidewalks
    4. Violation: 160 Weeds and Plant Growth
    5. Inspection: Posting of Hearing Notice No Violation
    6. Hearing: Initial Hearing Dismissed Wrong Location

    The city links this case to permit 06BLD-09786.

  3. Code enforcement Case ENVHADJ-20032486EH Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 06BLD-09786.

  4. Permit Demolition Certificate of Occupancy - Issued No Meter

    Demolish Structure to grade. All permits issued for demolition require the Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection.

    Permit
    06BLD-09786
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
  5. Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved

    after hours

    Permit
    05ELC-01540
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $150
    Contractor
    Double "S" Electric
    Days from application to issue
    10