Holy Cross

1024 Charbonnet Street is in Holy Cross, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 21 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in February 2026. 2 are still open. A demolition permit was filed in May 2025. A building here was demolished under the SDER program, completed in April 2017. There was 1 past code enforcement case, the latest in January 2015, all closed. On this block in the past year: 6 requests to 311 and 1 call to police.

Zoning
HU-RD2
Historic district
None
Council district
E
Ward
9
Lot size
4,315 sq ft
Parcel
41125634

Everything on record here

23 records, newest first · 2 open

  1. Permit Electrical Service / Circuit / Feeder Other

    We will supply and install an 18kW Generac generator. The generator will be mounted on a 44" stand. We will install a 200amp ATS. An appropriately sized gas line will be installed, including any necessary utility upgrades or modifications.

    Permit
    26-04689-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $18,193
    Fees
    $103
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    19
    Expires
    Sep 9, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Mechanical Fuel Gas Other

    We will supply and install an 18kW Generac generator. The generator will be mounted on a 44" stand. We will install a 200amp ATS. An appropriately sized gas line will be installed, including any necessary utility upgrades or modifications.

    Permit
    26-03325-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $18,193
    Fees
    $80
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    16
    Expires
    Aug 18, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Mechanical Fuel Gas Permit Cancelled

    We will supply and install an 18kW Generac generator. The generator will be mounted on a 44" stand. We will install a 200amp ATS. An appropriately sized gas line will be installed, including any necessary utility upgrades or modifications.

    Permit
    25-36632-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $18,193
    Fees
    $125
    Contractor
    Jeremiah Alexander Johnson
    1. Application submitted

    See this permit on One Stop

  4. Permit Mechanical Fuel Gas Other

    Install gas line to supply 4 gas fixtures: stove, dryer,furnace, water heater. install 40 gallon gas hot water heater.

    Permit
    25-30031-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $4,800
    Fees
    $20
    Contractor
    Troy A. Jeffreys
    Days from application to issue
    0
    Expires
    Mar 30, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Mechanical HVAC Other

    3.5 ton Cond, heater coil, duct,vent

    Permit
    25-29094-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $12,000
    Fees
    $68
    Contractor
    Sam Joseph Celino Jr.
    Days from application to issue
    0
    Expires
    Mar 23, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  6. Permit Plumbing Permit Other

    New construction

    Permit
    25-28460-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $140
    Contractor
    Jennings Quincy
    Days from application to issue
    12
    Expires
    Mar 30, 2026

    See this permit on One Stop

  7. Permit Electrical Service / Circuit / Feeder Other

    Wire home with 200 amp service and 18 new circuits. Edgar Young 813-0256.

    Permit
    25-20805-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $4,850
    Fees
    $154
    Contractor
    Edgar NMI Young, Jr.
    Days from application to issue
    1
    Expires
    Jan 11, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  8. Permit Construction Loop Other

    Install 100 amp temp pole. Edgar Young 813-0256

    Permit
    25-20803-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $650
    Fees
    $40
    Contractor
    Edgar NMI Young, Jr.
    Days from application to issue
    1
    Expires
    Jan 11, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  9. Permit New Construction Other

    New construction of a single family home, consisting of 3 bedrooms and 2 baths. single story building 1600 sqft, existing driveway.

    Permit
    25-17255-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $334,590
    Fees
    $2,070
    Contractor
    Ducar Construction LLC
    Days from application to issue
    22
    Expires
    Dec 27, 2025
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  10. Permit Demolition Other

    House was a single family that caught on fire and burned house to the floor. We are only removing all debris as per pictures attached.

    Permit
    25-12878-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $140
    Contractor
    Ducar Construction LLC
    Days from application to issue
    32
    Expires
    Nov 30, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  11. Permit Mechanical Fuel Gas Permit Finaled

    Install 3/4 underground natural gas line to supply a gas grill and fire pit.

    Permit
    22-24064-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $415
    Fees
    $245
    Contractor
    Tommie Gerald Zenon
    Days from application to issue
    28
    Expires
    Mar 8, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  12. Permit Accessory Structure Other

    Concrete driveway extension and install concrete patio in backyard. No curb, sidewalk or street connection work.

    Permit
    22-06180-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100
    Contractor
    Jay Dove Group Inc
    1. Application submitted

    See this permit on One Stop

  13. Permit Mechanical Fuel Gas Other

    Gas line for a new generator

    Permit
    22-00857-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $2,060
    Fees
    $80
    Contractor
    Tommie G Zenon
    Days from application to issue
    4
    Expires
    Jul 14, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  14. Permit Permanent Generator Permit Finaled

    Wiring of automatic transfer switch ATS and Natural Gas 18kW Generac generator for standby power.

    Permit
    21-32549-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $1,725
    Fees
    $100
    Contractor
    Tommie Gerald Zenon
    Days from application to issue
    54
    Expires
    Jul 12, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  15. Permit Accessory Structure Occupancy

    Install Natural Gas Generac Generator on an 36" above ground aluminum stand with legs concreted 18" into the ground.

    Permit
    21-27522-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $10,801
    Fees
    $115
    Contractor
    Jay Dove Group Inc
    Days from application to issue
    45
    Expires
    May 17, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  16. Permit Mechanical Fuel Gas Permit Finaled

    INSTALL A NEW GAS LINE 90 FT LONG FOR 4 OUTLETS INCLUDING A GAS TANK WATER HEATER

    Permit
    21-00859-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $3,600
    Fees
    $35
    Days from application to issue
    1
    Expires
    Jul 13, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  17. Permit Electrical Service / Circuit / Feeder Permit Finaled

    wiring of new construction single dwelling home. 125 amp service with 21 new circuits. All gas with optional electric dryer. 22 recess can light fixtures. Smoke detection system.

    Permit
    20-41655-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $7,133
    Fees
    $141
    Contractor
    Kirk Frank Dice
    Days from application to issue
    2
    Expires
    Mar 29, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  18. Permit Mechanical HVAC Permit Issued

    3.5 TON GAS 14 seer cond. heater in coil new duct

    Permit
    20-40715-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $500,000
    Fees
    $68
    Contractor
    Ducar Real Estate Investments LLC
    Days from application to issue
    5
    Expires
    Mar 21, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  19. Permit Construction Loop Permit Finaled

    installation of temporary power pole for construction of new single family dwelling home.

    Permit
    20-38937-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $500
    Fees
    $40
    Contractor
    Kirk Frank Dice
    Days from application to issue
    0
    Expires
    Feb 26, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  20. Permit New Construction Occupancy

    New Construction as per plans attached

    Permit
    20-38381-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $175,000
    Fees
    $1,110
    Contractor
    Ducar Construction LLC
    Days from application to issue
    6
    Expires
    Feb 25, 2021
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  21. Demolition SDER demolition Completed
    Program
    SDER
    Units
    1
    Started
    Apr 20, 2017
    Completed
    Apr 20, 2017

    Source: data.nola.gov BlightStatus demolitions (2009–2019, no longer updated)

  22. Permit Demolition Permit Issued

    NCDAC OCTOBER 3, 2016 - DRC-CODE ENFORCEMENT demolition

    Permit
    16-30112-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $120
    Contractor
    Drc Emergency Services LLC
    Days from application to issue
    143
    Expires
    Aug 3, 2017

    See this permit on One Stop

  23. Code enforcement Case 15-00351-MPM Closed

    A hearing was held on 06/16/2015 with a result of "Guilty".

    1. Violation: 160 Weeds and Plant Growth
    2. Violation: 167 Paint or Protective Treatment
    3. Violation: 169 Rafters
    4. Violation: 169 Studs
    5. Violation: 171 Weatherboards
    6. Violation: 172 Roofs
    7. Violation: 179 Windows
    8. Inspection: Inspection Violation: No WIP
    9. Inspection: Posting of Hearing Notice Violation: No WIP
    10. Hearing: Initial Hearing Guilty
    11. Inspection: Posting of Judgment Violation: No WIP

    The city links this case to permit 26-04689-SERV.