Holy Cross
926 Lamanche Street is in Holy Cross, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 5 permits on record here; the most recent, a solar permit, was filed in November 2024. 2 are still open. On this block in the past year: 10 requests to 311 and 2 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- National Register
- Holy Cross Historic District
- Council district
- E
- Ward
- 9
- Lot size
- 4,373 sq ft
- Parcel
- 41125851
Everything on record here
5 records, newest first · 2 open
-
Permit Solar Other
Solar-check meter and wiring
- Permit
- 24-34769-SOLR
- Type
- Solar
- Work
- Solar
- Estimated cost (applicant’s figure)
- $24,597
- Fees
- $61
- Contractor
- Glynn Raye Woodall, Jr
- Days from application to issue
- 5
- Expires
- May 19, 2025
-
Permit Renovation (Non-Structural) Permit Finaled
Install 5.74 kW solar panel system on existing building-no structural changes
- Permit
- 24-33459-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $29,597
- Fees
- $270
- Contractor
- PosiGen Developer LLC
- Days from application to issue
- 13
- Expires
- May 14, 2025
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Permit Renovation (Non-Structural) Permit Finaled
General cosmetic repairs to existing single as per HDLC approval - remove aluminum siding, repair wood siding exterior, repair damaged window on front left side of building, and repair/replace shingles where needed in rear of house.
- Permit
- 16-27153-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $1,350
- Fees
- $70
- Days from application to issue
- 0
- Expires
- Feb 18, 2017
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE
- Permit
- 07ELC-15596
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $90
- Contractor
- Malone Electrical
- Days from application to issue
- 10
-
Permit Residential APPROVAL
Katrina Repairs
- Permit
- ACCELA-91379
- Type
- Residential
- Work
- Repair
- Estimated cost (applicant’s figure)
- $100,000