6316 North Miro Street is in Lower Ninth Ward, zoned S-RS (Newer neighborhoods, single-family homes). The city has 7 permits on record here; the most recent, a change of address permit, was filed in October 2016. 5 are still open. A demolition permit was filed in November 2009. A building here was demolished under the NORA program, completed in December 2010. There was 1 past code enforcement case, the latest in April 2009, all closed. On this block in the past year: 1 request to 311 and 0 calls to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 14,446 sq ft
- Parcel
- 41126642
Everything on record here
9 records, newest first · 5 open
-
Permit Change of Address Permit Issued
Merge 3 lots into one parcel with the address of 6322 N Miro St. LOT 13, 6316 N Miro St retired address LOT 11, 6328 N Miro St retired address LOT 12, 6322 N Miro St current address LOTS 11, 12, and 13 are now Parcel 13A
- Permit
- 16-32962-ECOA
- Type
- Change of Address
- Work
- Change of Address
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 317
- Expires
- Feb 18, 2018
-
Demolition NORA demolition Completed
- Program
- NORA
- Units
- 1
- Started
- Dec 9, 2010
- Completed
- Dec 9, 2010
Source: data.nola.gov BlightStatus demolitions (2009–2019, no longer updated)
-
Permit Demolition Application Acceptance - Approved No Review
PERMIT ISSUED TO DEMOLISH SLAB ONLY.
- Permit
- 09BLD-07486
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $100
- Contractor
- Camp Dresser & Mckee
- Days from application to issue
- 5
-
Code enforcement Case ENVHADJ-20023220EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 16-32962-ECOA.
-
Permit Demolition Certificate of Occupancy - Issued No Meter
DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION. OVER 70% (JAY C. NICKELL)
- Permit
- 07BLD-03754
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
-
Permit Demolition Certificate of Occupancy - Issued No Meter
Demolish Structure to grade. All permits issued for demolition require the Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection.
- Permit
- 06BLD-10736
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
-
Permit Demolition Certificate of Occupancy - Issued No Meter
Demolish Structure to grade. All permits issued for demolition require the Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection.
- Permit
- 06BLD-10766
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
-
Permit Certificate of Occupancy Closed
Approve Home Based Business, Case #F6184, Called Out Productions, Check #2432
- Permit
- 05OCC-00503
- Type
- Certificate of Occupancy
- Work
- NA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $150
-
Permit Electrical Repair / Replacement / Addition Inspection - Completed
vacancy
- Permit
- 04ELC-07502
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Malone Electrical
- Days from application to issue
- 10