1607 Alabo Street is in Lower Ninth Ward, zoned HU-MU (Older neighborhoods, walkable mix of shops with homes above). The city has 9 permits on record here; the most recent, an electrical repair / replacement / addition permit, was filed in September 2021. 8 are still open. A demolition permit was filed in July 2006. There was 1 past code enforcement case, the latest in April 2009, all closed. On this block in the past year: 1 request to 311 and 3 calls to police.
- Zoning
- HU-MU
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 3,021 sq ft
- Parcel
- 41126751
Everything on record here
10 records, newest first · 8 open
-
Permit Electrical Repair / Replacement / Addition Permit Issued
Repairs to Service, remounted service stem sue to storm (no new EQUIPMENT)
- Permit
- 21-25436-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $550
- Fees
- $40
- Contractor
- Barry Joseph Sorrell
- Days from application to issue
- 0
- Expires
- Mar 9, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
-
Code enforcement Case ENVHADJ-20021862P Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 21-25436-ERPR.
-
Permit General Mechanical Inspection - Completed
*TROY JEFFREYS W/H METER CK#3392
- Permit
- 09MCH-00069
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $50
- Contractor
- Troy Services
- Days from application to issue
- 5
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
NEW CONSTRUCTION- SENT TO BUILDING 12/15/2008. SENT TO ENTERGY 12/17/2008.
- Permit
- 08ELC-25011
- Type
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $0
- Fees
- $132
- Contractor
- Wilson Electric
-
Permit Construction Loop Application Acceptance - Approved
TEMP POLE
- Permit
- 08ELC-08933
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Wilson Electric
- Days from application to issue
- 10
-
Permit New Construction Certificate of Occupancy - Issued No Meter
Construct 1,746 SF two-story single-family dwelling as per plans.
- Permit
- 07BLD-10215
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $60,000
- Fees
- $410
- Contractor
- Robert D. Lee Consulting Engineer
- Days from application to issue
- 84
-
Permit Demolition Certificate of Occupancy - Issued No Meter
DEMOLISH TO GRADE; HAUL AWAY DEBRIS WITHIN 72 HOURS OF DEMOLITION.
- Permit
- 06BLD-04543
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $90
- Days from application to issue
- 5
-
Permit Electrical
ELECTRICAL REWIRING SINGLE-FAMILY DWELLING ELBRED MALONE
- Permit
- E03009261
- Type
- Electrical
- Days from application to issue
- 0
-
Permit Electrical
ELECTRICAL CONSTRUCTION LOOP SINGLE-FAMILY DWELLING ELBRED MALONE
- Permit
- E03008327
- Type
- Electrical
- Days from application to issue
- 0
-
Permit Building
NEW CONSTRUCTION PROJECT SINGLE-FAMILY DWELLING NEW CONSTRUCTION OF A SINGLE FAMILY DWELLING AS PER SKETCH AND BZA WAIVER DOCKET #188-03 & DPW APPROVAL.
- Permit
- B03004985
- Type
- Building
- Days from application to issue
- 5