Lower Ninth Ward

2300 Tupelo Street is in Lower Ninth Ward, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 2 permits on record here; the most recent, a demolition permit, was filed in July 2008. 2 are still open. A demolition permit was filed in July 2008. There were 2 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 7 requests to 311 and 13 calls to police.

Zoning
HU-RD2
Historic district
None
Council district
E
Ward
9
Lot size
3,268 sq ft
Parcel
41129194

Everything on record here

4 records, newest first · 2 open

  1. Code enforcement Case ENVHADJ-2001555PB Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 08BLD-05280.

  2. Code enforcement Case ENVHADJ-962158 Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 08BLD-05280.

  3. Permit Demolition Inspection - Completed No Requirements

    DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.NCDC APPROVED (SLAB REMAINS)

    Permit
    08BLD-05280
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Contractor
    Drc Emergency Servces,Llc, Drc Emergency Servces,Llc
    Days from application to issue
    7
  4. Permit General Mechanical Inspection - Completed

    REPLACE GAS WATER HEATER. CARLTON SMITH (#20520)

    Permit
    05MCH-04358
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $20
    Contractor
    Acadian Hydro Tunnelers Co. Inc.
    Days from application to issue
    5