Leonidas

1811 Hollygrove Street is in Leonidas, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Carrollton historic district under partial HDLC control, where demolition needs HDLC review. The city has 6 permits on record here; the most recent, a mechanical fuel gas permit, was filed in February 2022. There were 4 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 3 requests to 311 and 18 calls to police.

Zoning
HU-RD2
Historic district
Carrollton (Partial control)
National Register
Carrollton Historic District
Council district
A
Ward
17
Lot size
3,152 sq ft
Parcel
41131114

Everything on record here

10 records, newest first

  1. Permit Mechanical Fuel Gas Permit Finaled

    6 months out gas inspection

    Permit
    22-05050-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $350
    Fees
    $30
    Days from application to issue
    6
    Expires
    Aug 22, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Electrical Vacancy Permit Cancelled

    Vacancy

    Permit
    19-01631-EVAC
    Type
    Electrical Vacancy
    Work
    Electrical Vacancy
    Estimated cost (applicant’s figure)
    $475
    Fees
    $40
    Contractor
    Oscar L. Carter Jr.
    1. Application submitted

    See this permit on One Stop

  3. Permit Electrical Vacancy Permit Finaled

    Vacancy

    Permit
    19-02250-EVAC
    Type
    Electrical Vacancy
    Work
    Electrical Vacancy
    Estimated cost (applicant’s figure)
    $475
    Fees
    $40
    Contractor
    Oscar L. Carter Jr.
    Days from application to issue
    0
    Expires
    Jul 22, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Mechanical Fuel Gas Permit Finaled

    Meter Out Over 6 Months. 1093

    Permit
    19-02125-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Keith Anthony Thomas
    Days from application to issue
    0
    Expires
    Jul 22, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Renovation (Non-Structural) Other

    No repairs or construction. Electrical only. No work to be done under this permit.

    Permit
    19-01948-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $425
    Fees
    $65
    Days from application to issue
    0
    Expires
    Jul 18, 2019
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Permit approved
    5. Issue date

    See this permit on One Stop

  6. Permit General Mechanical Permit Finaled

    1- meter out over six months

    Permit
    12-18029-MECH
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Days from application to issue
    11
    Expires
    Jan 17, 2013

    See this permit on One Stop

  7. Code enforcement Case ENVHADJ-20033345SN Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 22-05050-FGAS.

  8. Code enforcement Case ENVHADJ-2005858SN Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 22-05050-FGAS.

  9. Code enforcement Case ENVHADJ-943247 Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 19-01631-EVAC.

  10. Code enforcement Case ENVHADJ-953621 Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 22-05050-FGAS.