Viavant - Venetian Isles

54621 CHEF MENTEUR HWY is in Viavant - Venetian Isles, zoned C-3 (Heavy commercial, auto-oriented, for large shopping centers). The city has 3 permits on record here; the most recent, an electric vehicle charger: electrical permit, was filed in August 2023. 1 is still open. On this block in the past year: 12 requests to 311 and 51 calls to police.

Zoning
C-3
Historic district
None
Council district
E
Ward
9
Lot size
6,478 sq ft
Parcel
41131831

Everything on record here

3 records, newest first · 1 open

  1. Permit Electric Vehicle Charger: Electrical Permit Finaled

    Installation of 54KW EV Charging Station

    Permit
    23-24156-EVCH
    Type
    Electric Vehicle Charger: Electrical
    Work
    Electric Vehicle Charger: Electrical
    Estimated cost (applicant’s figure)
    $45,400
    Fees
    $172
    Contractor
    Ryan Carl Orgeron
    Days from application to issue
    12
    Expires
    Mar 12, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Electric Vehicle Charger: Installation Other

    Install EV Charging Stations in Banner Chevrolet Permitting, inspection, engineering, and commissioning fees are included. • Entergy fees (if any) are not included. • Provide and install a 25’ pressure treated wood pole between the used car parking lot and the main building parking lot. • Provide and install a 400A weatherproof disconnect and meter on the above-mentioned pole. • Route conduit and conductors from the top of the meter to the top of the pole to provide a connection to Entergy conductors. • Saw-cut the blacktop from the pole to the main building. • Route conduit and conductors from the 400A disconnect underground to the main building. Conduit will turn up and penetrate the building in the service write-up area. • Provide and install a 400A panel on the wall in the service write -up area and connect to the conduit. • Install the owner provided 54KW EV charger next to the panel. • Route conduit and conductors from the panel to the charger and terminate. • Install the owner provided 25KW EV charger to the opposite side of the panel. • Provide and install a 37.5KW 480V to 240V transformer on the opposite side of the panel. • Route conduit and conductors from the panel to the transformer, and from the transformer to the charger and terminate. • Route a ¾” conduit with one cat 6 cable across the service write-up area into the drop ceiling ov

    Permit
    23-18639-EVIN
    Type
    Electric Vehicle Charger: Installation
    Work
    Electric Vehicle Charger: Installation
    Estimated cost (applicant’s figure)
    $45,400
    Fees
    $350
    Contractor
    A-1 Electrical Contractors. Inc
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved

    See this permit on One Stop

  3. Permit Electrical Repair / Replacement / Addition Permit Issued

    CELL-SITE REPAIRS

    Permit
    14-11517-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Contractor
    Hoai Trong Do
    Days from application to issue
    0
    Expires
    Oct 10, 2014

    See this permit on One Stop

    Placed here by its tax bill number from “9550 HIGHWAY 11”.