54621 CHEF MENTEUR HWY is in Viavant - Venetian Isles, zoned C-3 (Heavy commercial, auto-oriented, for large shopping centers). The city has 3 permits on record here; the most recent, an electric vehicle charger: electrical permit, was filed in August 2023. 1 is still open. On this block in the past year: 12 requests to 311 and 51 calls to police.
- Zoning
- C-3
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 6,478 sq ft
- Parcel
- 41131831
Everything on record here
3 records, newest first · 1 open
-
Permit Electric Vehicle Charger: Electrical Permit Finaled
Installation of 54KW EV Charging Station
- Permit
- 23-24156-EVCH
- Type
- Electric Vehicle Charger: Electrical
- Work
- Electric Vehicle Charger: Electrical
- Estimated cost (applicant’s figure)
- $45,400
- Fees
- $172
- Contractor
- Ryan Carl Orgeron
- Days from application to issue
- 12
- Expires
- Mar 12, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electric Vehicle Charger: Installation Other
Install EV Charging Stations in Banner Chevrolet Permitting, inspection, engineering, and commissioning fees are included. • Entergy fees (if any) are not included. • Provide and install a 25’ pressure treated wood pole between the used car parking lot and the main building parking lot. • Provide and install a 400A weatherproof disconnect and meter on the above-mentioned pole. • Route conduit and conductors from the top of the meter to the top of the pole to provide a connection to Entergy conductors. • Saw-cut the blacktop from the pole to the main building. • Route conduit and conductors from the 400A disconnect underground to the main building. Conduit will turn up and penetrate the building in the service write-up area. • Provide and install a 400A panel on the wall in the service write -up area and connect to the conduit. • Install the owner provided 54KW EV charger next to the panel. • Route conduit and conductors from the panel to the charger and terminate. • Install the owner provided 25KW EV charger to the opposite side of the panel. • Provide and install a 37.5KW 480V to 240V transformer on the opposite side of the panel. • Route conduit and conductors from the panel to the transformer, and from the transformer to the charger and terminate. • Route a ¾” conduit with one cat 6 cable across the service write-up area into the drop ceiling ov
- Permit
- 23-18639-EVIN
- Type
- Electric Vehicle Charger: Installation
- Work
- Electric Vehicle Charger: Installation
- Estimated cost (applicant’s figure)
- $45,400
- Fees
- $350
- Contractor
- A-1 Electrical Contractors. Inc
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
-
Permit Electrical Repair / Replacement / Addition Permit Issued
CELL-SITE REPAIRS
- Permit
- 14-11517-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Hoai Trong Do
- Days from application to issue
- 0
- Expires
- Oct 10, 2014
Placed here by its tax bill number from “9550 HIGHWAY 11”.