7917 Hickory Street is in East Carrollton, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Carrollton historic district under partial HDLC control, where demolition needs HDLC review. The city has 3 permits on record here; the most recent, a renovation (non-structural) permit, was filed in July 2026. 1 is still open. On this block in the past year: 1 request to 311 and 1 call to police.

Zoning
HU-RD2
Historic district
Carrollton (Partial control)
National Register
Carrollton Historic District
Council district
A
Ward
16
Lot size
4,462 sq ft
Parcel
41133602

Everything on record here

3 records, newest first · 1 open

  1. Permit Renovation (Non-Structural) Permit Cancelled

    Installation of hardi board siding.

    Permit
    26-20402-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $54,500
    Fees
    $395
    Contractor
    Reliable Foundations, LLC.
    1. Application submitted

    See this permit on One Stop

  2. Permit Change of Address Permit Issued

    24-17578-RNVS Single family KEEP 7919 Hickory St (AM11361801, U472797, A296277) RETIRE 7917 Hickory St RETIRE 7921 Hickory St (U472796)

    Permit
    24-19306-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Dec 24, 2024
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

    Placed here by an address range from “7917-7921 Hickory St”.

  3. Permit Renovation (Structural) Permit Issued

    Shoring

    Permit
    24-17578-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $47,000
    Fees
    $355
    Contractor
    Cable Lock Foundation Repair
    Days from application to issue
    21
    Expires
    Dec 27, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop