Lower Garden District

1459 Magazine Street is in Lower Garden District, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Lower Garden District historic district under full HDLC control, so most exterior changes need approval first. The city has 2 permits on record here; the most recent, an HDLC COA permit, was filed in February 2023. On this block in the past year: 26 requests to 311 and 17 calls to police.

Zoning
HU-RD2
Historic district
Lower Garden District (Full control)
National Register
Lower Garden District
Council district
B
Ward
1
Lot size
4,051 sq ft
Parcel
41135753

Everything on record here

2 records, newest first

  1. Permit HDLC COA Permit Finaled

    For all on double-hung wood windows; repair wood-rot to sills, styles, trim and sashes as necessary. Apply elastomeric caulk to seal gap between window unit and masonry. Paint all double-hung wood windows with exterior grade white paint, install split mini split air conditioning system, cap gas line in bathroom, provide termite treatment

    Permit
    23-02735-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    31
    Expires
    Sep 6, 2023

    See this permit on One Stop

  2. Permit Renovation (Non-Structural) Occupancy

    For all on double-hung wood windows; repair wood-rot to sills, styles, trim and sashes as necessary. Apply elastomeric caulk to seal gap between window unit and masonry. Paint all double-hung wood windows with exterior grade white paint, install split mini split air conditioning system, cap gas line in bathroom, provide termite treatment

    Permit
    23-02735-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $29,800
    Fees
    $405
    Contractor
    Veterans Construction, LLC -Al Jackson
    Days from application to issue
    36
    Expires
    Sep 7, 2023
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection