Leonidas
8906 Plum Street is in Leonidas, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Carrollton historic district under partial HDLC control, where demolition needs HDLC review. The city has 7 permits on record here; the most recent, a street cut permit, was filed in October 2023. On this block in the past year: 1 request to 311 and 0 calls to police.
- Zoning
- HU-RD2
- Historic district
- Carrollton (Partial control)
- National Register
- Carrollton Historic District
- Council district
- A
- Ward
- 17
- Lot size
- 1,367 sq ft
- Parcel
- 41136836
Everything on record here
7 records, newest first
-
Permit Street Cut Other
Install new gas main and service to customer.
- Permit
- 23-29122-RSTC
- Type
- Street Cut
- Work
- Street Cut
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 7
- Expires
- Apr 30, 2024
-
Permit Electrical Service / Circuit / Feeder Permit Finaled
the electrical final inspection has been done (P#21-05098-ERPR) on April 28, 2023. Due to time length of permit. we are told to apply for service permit to update our existing permit. Please advise us in the foregoing matter.
- Permit
- 23-23817-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $8,500
- Fees
- $145
- Contractor
- Mohamad Ardekani
- Days from application to issue
- 3
- Expires
- Feb 29, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Repair / Replacement / Addition Permit Cancelled
New wiring and installation of 200amp service panel
- Permit
- 21-05098-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $8,500
- Fees
- $145
- Contractor
- Mohamad Ardekani
- Expires
- Oct 28, 2023
- Application submitted
- Application review
- Permit approved
- First inspection
- Issue date
-
Permit Mechanical HVAC Permit Finaled
Install 5 ton electric mini split HVAC
- Permit
- 23-08149-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $5,500
- Fees
- $91
- Days from application to issue
- 1
- Expires
- Sep 28, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Install one tankless water heater and 50 feet of new gas line
- Permit
- 23-07647-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $1,100
- Fees
- $40
- Days from application to issue
- 22
- Expires
- Oct 18, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Construction Loop Permit Finaled
T/P
- Permit
- 19-33395-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $350
- Fees
- $40
- Contractor
- Mohamad Ardekani
- Days from application to issue
- 2
- Expires
- Apr 21, 2020
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit New Construction Occupancy
New construction of the 3 levels residential building, as noted on the drawings 0519-C-1...22. The structure is the slab on grade foundation, steel framing at the ground level, and stud framing above. The structure is within the zoning limits and setbacks and not in the historic district. All utilities are available at the site. The distance from the Mississippi river levee is greater than 1,500 ft. and does not require US Army Corps of Engineers permit. The building will be used as a single family residence. This permit request is for the new complete construction of the building and all incidentals required to finish the entire structure.
- Permit
- 19-18523-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $180,000
- Fees
- $1,140
- Contractor
- Toscano Construction
- Days from application to issue
- 121
- Expires
- Apr 9, 2020
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection