2729 Bristol Place is in Old Aurora, zoned S-RS (Newer neighborhoods, single-family homes). The city has 3 permits on record here; the most recent, a mechanical fuel gas permit, was filed in December 2024. On this block in the past year: 4 requests to 311 and 1 call to police.

Zoning
S-RS
Historic district
None
Council district
C
Ward
15
Lot size
8,505 sq ft
Parcel
41139237

Everything on record here

3 records, newest first

  1. Permit Mechanical Fuel Gas Other

    Installing a 22kW Generac generator with a 100 amp transfer switch for emergency backup power.

    Permit
    24-37019-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $13,129
    Fees
    $80
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    1
    Expires
    Jun 11, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Permanent Generator Other

    Installing a 22kW Generac generator with a 100 amp transfer switch for emergency backup power.

    Permit
    24-37018-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $13,129
    Fees
    $73
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    10
    Expires
    Jun 20, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Accessory Structure Other

    Installing a 22kW Generac generator with a 100 amp transfer switch for emergency backup power.

    Permit
    24-35013-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $13,129
    Fees
    $190
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    22
    Expires
    Jun 10, 2025
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop