Old Aurora

2661 Gallinghouse Street is in Old Aurora, zoned S-RS (Newer neighborhoods, single-family homes). The city has 3 permits on record here; the most recent, a mechanical fuel gas permit, was filed in November 2022. 1 is still open. On this block in the past year: 15 requests to 311 and 10 calls to police.

Zoning
S-RS
Historic district
None
Council district
C
Ward
15
Lot size
6,022 sq ft
Parcel
41139537

Everything on record here

3 records, newest first · 1 open

  1. Permit Mechanical Fuel Gas Permit Finaled

    Run 80’ of pipe to 22KW Generator

    Permit
    22-34635-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $1,600
    Fees
    $80
    Days from application to issue
    2
    Expires
    May 17, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Permanent Generator Permit Finaled

    GENERATOR INSTALL

    Permit
    22-33757-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $7,700
    Fees
    $106
    Contractor
    Brandon Augustus Francois
    Days from application to issue
    15
    Expires
    May 22, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Accessory Structure Permit Issued

    INSTALLATION OF PERMANENT GENERATOR WITH GAS LINE EXTENSION AND ELECTRICAL SYSTEM ALTERATIONS TO MAKE UNIT COMPATIBLE FOR OPERATION AT RESIDENCE /// /// DOCUMENTS ATTACHED: CONTRACT & PO SHEET // INSTALL REQUIREMENTS ACKNOWLEDGEMENT // SITE PLAN // GENERATOR MFR’S SPECS SHEET

    Permit
    22-21902-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $15,680
    Fees
    $200
    Contractor
    B Powered Electric LLC
    Days from application to issue
    100
    Expires
    Apr 28, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop