Black Pearl

7535 Garfield Street is in Black Pearl, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Carrollton historic district under partial HDLC control, where demolition needs HDLC review. The city has 2 permits on record here; the most recent, an electrical repair / replacement / addition permit, was filed in March 2019. On this block in the past year: 2 requests to 311 and 0 calls to police.

Zoning
HU-RD2
Historic district
Carrollton (Partial control)
National Register
Carrollton Historic District
Council district
A
Ward
16
Lot size
2,527 sq ft
Parcel
41142404

Everything on record here

2 records, newest first

  1. Permit Electrical Repair / Replacement / Addition Permit Finaled

    removing and replacing 2 outlets that are in two walls being rebuilt; install 6 recessed cans

    Permit
    19-07530-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $40
    Contractor
    Guy Gariel Daigle Jr.
    Days from application to issue
    1
    Expires
    Sep 15, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Renovation (Non-Structural) Other

    Rebuilding the interior of the first room due to a ceiling collapse. Removing and replacing old furring strips and sheetrock on 2 walls and the sheetrock on the ceiling. Roughing in one 4x3 window to 6x3 to match original window. Removing rotted barge boards on the interior of the house and replacing with similar material. Depending on damage, may need to take down vinyl siding to affect repairs and replace once repairs are complete.

    Permit
    19-01252-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $9,498
    Fees
    $110
    Days from application to issue
    57
    Expires
    Sep 12, 2019
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop