Tall Timbers - Brechtel

4620 Lennox Boulevard is in Tall Timbers - Brechtel, zoned S-RS (Newer neighborhoods, single-family homes). The city has 3 permits on record here; the most recent, a permanent generator permit, was filed in May 2023. 1 is still open. On this block in the past year: 4 requests to 311 and 6 calls to police.

Zoning
S-RS
Historic district
None
Council district
C
Ward
15
Lot size
9,066 sq ft
Parcel
41145195

Everything on record here

3 records, newest first · 1 open

  1. Permit Permanent Generator Permit Finaled

    Install a 26kW Generac generator and a 200 amp transfer switch for emergency back up power.

    Permit
    23-12368-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $19,900
    Fees
    $103
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    10
    Expires
    Nov 15, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Mechanical Fuel Gas Permit Finaled

    Install a 26kW Generac Generator and a 200 amp transfer switch for emergency backup power.

    Permit
    23-12366-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $19,900
    Fees
    $92
    Contractor
    Ready Power LLC
    Days from application to issue
    4
    Expires
    Nov 9, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Accessory Structure Permit Issued

    Install a 26kW Generac Generator and a 200 amp Transfer Switch for emergency backup power.

    Permit
    23-09519-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $19,900
    Fees
    $220
    Contractor
    Ready Power LLC
    Days from application to issue
    23
    Expires
    Nov 4, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop