West End

6100 Pontchartrain Boulevard is in West End, zoned S-LB1 (Lake area neighborhood business). The city has 23 permits on record here; the most recent, an attached sign permit, was filed in September 2019. 7 are still open. A demolition permit was filed in June 2006. There were 5 past code enforcement cases, the latest in February 2012, all closed. On this block in the past year: 1 request to 311 and 12 calls to police.

Zoning
S-LB1
Historic district
None
Council district
A
Ward
17
Lot size
20,148 sq ft
Parcel
41145405

Everything on record here

28 records, newest first · 7 open

  1. Permit Attached Sign Permit Issued

    Manufacture and install (1) set of 2'-3" / 2'-3" to 1'-8" LED illuminated channel letters with 4'-7" X 5'-0" logo.

    Permit
    19-28033-SATT
    Type
    Attached Sign
    Work
    Attached Sign
    Estimated cost (applicant’s figure)
    $0
    Fees
    $265
    Contractor
    A-1 Signs Inc
    Days from application to issue
    72
    Expires
    May 15, 2020
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  2. Permit Change of Address Permit Issued

    add addresses 6100 Pontchartrain BLVD HM 6100 Pontchartrain BLVD Ste 100 6100 Pontchartrain BLVD Ste 101

    Permit
    19-25313-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Feb 12, 2020
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

  3. Permit Electrical Repair / Replacement / Addition Permit Issued

    Planned outage and reconnect for building. Will allow connection of service to new Suite 100.To connect line side of new meter to Entergy feeder.

    Permit
    19-24657-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $200
    Fees
    $40
    Contractor
    Frederick Andrew Schenck Sr.
    Days from application to issue
    13
    Expires
    Feb 19, 2020
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Mechanical Fuel Gas Permit Finaled

    1- 40 gallon EWH

    Permit
    19-19124-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $2,500
    Fees
    $20
    Days from application to issue
    1
    Expires
    Dec 14, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Electrical Service / Circuit / Feeder Permit Cancelled

    Install conduit, wiring, devices, and 200 amp/ 480 volt service for X Ray and new Medical Clinic. New Orleans East Hospital Pontchartrain Clinic.

    Permit
    19-14141-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $25,000
    Fees
    $163
    Contractor
    Frederick Andrew Schenck Sr.
    1. Application submitted
    2. Application review

    See this permit on One Stop

    Placed here by the building address from “6100 Pontchartrain Blvd, Suite 102”.

  6. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Tenant space buildout for medical clinic. New 200 amp service. Install conduit, wiring, devices, light fixtures. Connect new A/C equipment and appliances. 3 phase 480 volts.

    Permit
    19-14140-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $25,000
    Fees
    $103
    Contractor
    Frederick Andrew Schenck Sr.
    Days from application to issue
    46
    Expires
    Dec 19, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  7. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Tenant space buildout for medical clinic. New 200 amp service. Install conduit, wiring, devices, light fixtures. Connect new A/C equipment and appliances. New Orleans East Hospital Pontchartrain Clinic. 3 phase 120/208.

    Permit
    19-14139-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $25,000
    Fees
    $244
    Contractor
    Frederick Andrew Schenck Sr.
    Days from application to issue
    46
    Expires
    Dec 19, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  8. Permit Mechanical HVAC Permit Finaled

    Install 3 new split systems and 5 exhaust fans. Including all new duct work

    Permit
    19-13736-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $114,000
    Fees
    $163
    Contractor
    Donahue Favret
    Days from application to issue
    9
    Expires
    Nov 10, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  9. Permit Renovation (Structural) Occupancy

    Build out of an existing shell space for a new clinic as per plans.

    Permit
    19-03595-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $818,000
    Fees
    $4,968
    Days from application to issue
    49
    Expires
    Sep 25, 2019
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  10. Permit Moving Equipment Permit Issued

    Elevator installation

    Permit
    18-31318-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $95
    Contractor
    Schindler Elevator Corporation
    Days from application to issue
    0
    Expires
    Mar 21, 2019
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

  11. Permit Electrical Service / Circuit / Feeder Permit Finaled

    New panel,circuits,lighting,devices for dentist office.

    Permit
    18-17442-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $0
    Fees
    $154
    Contractor
    Brian P Borey
    Days from application to issue
    0
    Expires
    Nov 24, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  12. Permit Electrical Service / Circuit / Feeder Permit Finaled

    New panel,circuits,lighting,devices for dentist office.

    Permit
    18-17439-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $0
    Fees
    $184
    Contractor
    Brian P Borey
    Days from application to issue
    0
    Expires
    Nov 24, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  13. Permit Mechanical HVAC Permit Finaled

    Two 12.5 ton package units with 20kw electric heat each, on rooftop

    Permit
    18-12758-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $64,000
    Fees
    $175
    Days from application to issue
    14
    Expires
    Nov 1, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  14. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Two story office building with tenant build out on second floor.

    Permit
    17-39125-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $108,000
    Fees
    $241
    Days from application to issue
    1
    Expires
    May 16, 2018

    See this permit on One Stop

  15. Permit Construction Loop Permit Issued

    Two story office building

    Permit
    17-35492-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $100
    Fees
    $40
    Days from application to issue
    1
    Expires
    Apr 18, 2018

    See this permit on One Stop

  16. Permit New Construction Occupancy

    Construct 2-story 12,000 sq ft commercial building as per plans: ground floor - 4724 sq ft white box (separate permit required for build-out); 2nd floor - 2 offices (attorney office and orthodontist's office, included in this permit) TCO ---GOOD FOR 60 DAYS---TILL 2/18/2019

    Permit
    17-25395-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $2,390,000
    Fees
    $14,525
    Contractor
    Marsiglia Construction Co, Gary N Krasnow Architect
    Days from application to issue
    74
    Expires
    Apr 3, 2018

    See this permit on One Stop

  17. Permit Construction Loop Meter Release

    temp pole 16-34088-SPMA

    Permit
    16-37695-LOOP
    Type
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Days from application to issue
    0
  18. Permit Construction Loop Permit Finaled

    christmas tree lot/ temp pole related Permit #15-30902 Entergy account # 125496588 100amps & 8 circuits

    Permit
    15-33146-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Days from application to issue
    0
    Expires
    May 3, 2016

    See this permit on One Stop

  19. Permit Construction Loop Permit Issued

    christmas tree lot/ temp pole 14-32069-SPMA entergy account # 118683549

    Permit
    14-35120-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Contractor
    Barry Andrew Bode
    Days from application to issue
    0
    Expires
    May 11, 2015

    See this permit on One Stop

  20. Permit Construction Loop Permit Finaled

    Temporary Pole for Christmas Tree Lot - CHTRISTMAS TREE STAND Related permit #13-42627

    Permit
    13-43782-SERV
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Days from application to issue
    19
    Expires
    Jun 3, 2014

    See this permit on One Stop

  21. Code enforcement Case CEHB-12-0459 Closed

    The property was inspected on 02/15/2012 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied

    The city links this case to permit 19-28033-SATT.

  22. Code enforcement Case HCEC-12-00191 Closed

    The case was filed on 02/08/2012 but has since been closed without further action.

    The city links this case to permit 19-28033-SATT.

  23. Code enforcement Case CEHB-11-4698 Closed

    A hearing was held on 10/11/2011 with a result of "Guilty: Public Nuisance".

    1. Hearing: Initial Hearing Reset: Work in Progress
    2. Inspection: Inspection Violation Posted No WIP
    3. Inspection: Inspection Violation Posted No WIP
    4. Hearing: Reset Hearing Guilty: Public Nuisance
    5. Inspection: Inspection Violation Posted No WIP

    The city links this case to permit 19-28033-SATT.

  24. Code enforcement Case HCEVU-10-02188 Closed

    The property was inspected on 12/08/2010 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied

    The city links this case to permit 19-28033-SATT.

  25. Code enforcement Case HCEC-10-02718 Closed

    The case was filed on 11/22/2010 but has since been closed without further action.

    The city links this case to permit 19-28033-SATT.

  26. Permit Construction Loop Application Acceptance - Approved

    TEMP POLE

    Permit
    07ELC-15222
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Lamonte Electric
    Days from application to issue
    10
  27. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH VACANT RESIDENCE TO GRADE PER OWNERS REQUEST AND DEBRIS REMOVAL WITHIN 72 HOURS. OUTSIDE OF THE HOUSING CONSERVATION DISTRICT REVIEW COMMITTEE. ANY FURTHER CONSTRUCTION WILL REQUIRE A SEPARATE PERMIT.

    Permit
    06COM-01457
    Type
    Demolition
    Work
    NA
    Estimated cost (applicant’s figure)
    $3,500
    Fees
    $95
    Days from application to issue
    5
  28. Permit General Mechanical Inspection - Completed

    ENGERGY GAS LEAK. CARL BOURGEOIS (#49747)

    Permit
    04MCH-05382
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Al Bourgeois Plg&Htg
    Days from application to issue
    5