Lower Garden District

1152 Magazine Street is in Lower Garden District, zoned HU-MU (Older neighborhoods, walkable mix of shops with homes above). The city has 30 permits on record here; the most recent, a dumpster/construction zone permit, was filed in November 2026. 9 are still open. On this block in the past year: 4 requests to 311 and 24 calls to police.

Zoning
HU-MU
Historic district
None
National Register
Lower Garden District
Council district
B
Ward
2
Lot size
12,735 sq ft
Parcel
41145495

Everything on record here

32 records, newest first · 11 open

  1. Permit Dumpster/Construction Zone Permit Issued

    Temporary school bus loading and unloading zone for New Orleans Black Education History Week, a citywide historical observance recognized by Orleans Parish School Board resolution. BE NOLA (Black Education for New Orleans) is hosting school groups at Merchant Hall, 1152 Magazine St., each weekday morning, Nov. 16–20, 2026. We request reservation of the unmetered curb parking lane in front of Merchant Hall (about 300 ft) from 7:00 to 10:00 AM daily, posted with temporary “No Parking” signs, so school buses can unload students at the curb (8:00–8:45 AM) and reload them (9:00–9:10 AM). No construction, equipment, street closure or sidewalk closure. Travel lanes and sidewalks stay open. Site plan and event summary attached. Day-of contact: Gabrielle Deculus, .

    Permit
    26-33228-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $375
    Days from application to issue
    3
    Expires
    May 13, 2027

    See this permit on One Stop

  2. City record Dumpster/Construction Zone Application Review

    Black Education for New Orleans (BE NOLA) requests a temporary Parking Lane Rental / Temporary Parking Restriction for the unmetered curb lane on the 1100 block of Magazine Street, along the curb face in front of Merchant Hall (1152 Magazine St.), between , Monday, November 16 through Thursday, November 19, 2026, from each day. The reserved curb will be a temporary school bus loading and unloading zone for New Orleans Black Education History Week (NOBEHW), a citywide historical observance recognized by Orleans Parish School Board resolution. Merchant Hall is the week’s central hub. Each morning, school groups arrive by bus around 8:00 AM, students go inside for breakfast and a gallery walk, and buses depart for partner field-trip sites across the city by about 9:00 AM. We expect up to buses per morning and no more than 250 students per day. We are not requesting a street closure. Travel lanes and sidewalks will stay open. Buses will load and unload only within the reserved curb lane. BE NOLA staff, volunteers, and our event security team will manage student loading at the curb. BE NOLA will post City-approved temporary “No Parking” signs at least 48 hours in advance and remove them when the permit ends. The curb goes back to public parking after each day. Day-of contact: Gabrielle Deculus, Event Production, .

    1. Application Submitted
    2. Application Review

    See this record on One Stop · checked Nov 11, 2026

  3. City record Dumpster/Construction Zone Application Submitted

    Temporary school bus loading and unloading zone for New Orleans Black Education History Week, a citywide historical observance recognized by Orleans Parish School Board resolution. BE NOLA (Black Education for New Orleans) is hosting school groups at Merchant Hall, 1152 Magazine St., each weekday morning, Nov. 16–20, 2026. We request reservation of the unmetered curb parking lane in front of Merchant Hall (about 300 ft) from 7:00 to 10:00 AM daily, posted with temporary “No Parking” signs, so school buses can unload students at the curb (8:00–8:45 AM) and reload them (9:00–9:10 AM). No construction, equipment, street closure or sidewalk closure. Travel lanes and sidewalks stay open. Site plan and event summary attached. Day-of contact: Gabrielle Deculus, .

    1. Application Submitted
    2. Public Works - Traffic review Pending
    3. Parks and Parkways Tree Review review Pending

    See this record on One Stop · checked Nov 11, 2026

  4. Permit Mechanical HVAC Permit Finaled

    Install 1 7.5 ton system and 1 6 ton system with ductwork as per plans

    Permit
    23-27886-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $57,880
    Fees
    $729
    Days from application to issue
    1
    Expires
    Apr 12, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Mechanical HVAC Permit Finaled

    Install one 6 ton air handler with ductwork and condenser as per plans

    Permit
    23-27884-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $29,930
    Fees
    $399
    Days from application to issue
    1
    Expires
    Apr 12, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  6. Permit Dumpster/Construction Zone Other

    Course of construction debris removal

    Permit
    23-23587-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $340
    Contractor
    Mayer Building Company
    Days from application to issue
    17
    Expires
    Mar 11, 2024

    See this permit on One Stop

  7. Permit Mechanical Fuel Gas Permit Finaled

    100ft of gas line with three outlets consisting of two 199,000 btu tankless water heaters and one stove

    Permit
    23-23016-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $2,000
    Fees
    $90
    Days from application to issue
    1
    Expires
    Feb 22, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  8. Permit Plumbing Permit Permit Finaled

    Plumbing rough-in for renovation of a wine shop tenant space. Set fixtures.

    Permit
    23-16765-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $50
    Contractor
    Randy Deslatte
    Days from application to issue
    5
    Expires
    Dec 26, 2023

    See this permit on One Stop

  9. Permit Plumbing Permit Permit Finaled

    Plumbing rough-in and fixture set for pizza restaurant interior build out

    Permit
    23-16544-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $170
    Contractor
    Randy Deslatte
    Days from application to issue
    5
    Expires
    Dec 26, 2023

    See this permit on One Stop

  10. Permit Electrical Service / Circuit / Feeder Other

    Install a 200 amp circuit breaker, 200 amp panel and 100 amp panel, as well as safety switches, for a complete working electrical system.

    Permit
    23-16068-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $39,739
    Fees
    $175
    Contractor
    Ronald Francis Jouandot
    Days from application to issue
    2
    Expires
    Dec 15, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  11. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Furnish and install all conduit and wiring for complete working electrical system. Install pendents and wall sconces. As well as install circuit breaker, panel and safety switches.

    Permit
    23-15470-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $56,486
    Fees
    $229
    Contractor
    Ronald Francis Jouandot
    Days from application to issue
    6
    Expires
    Dec 13, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  12. Permit Street Cut Other

    cut permit

    Permit
    23-13407-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Days from application to issue
    62
    Expires
    Jan 17, 2024

    See this permit on One Stop

  13. Permit Electrical Repair / Replacement / Addition Permit Finaled

    Wire for and install exit light, emergency light and temporary fixtures in white box space.

    Permit
    23-06549-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $154,000
    Fees
    $40
    Contractor
    Edward Leroy Dawson
    Days from application to issue
    20
    Expires
    Sep 29, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  14. Permit Electrical Repair / Replacement / Addition Permit Finaled

    Installing temporary lighting in white box space.

    Permit
    23-06545-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $154,000
    Fees
    $40
    Contractor
    Edward Leroy Dawson
    Days from application to issue
    20
    Expires
    Sep 29, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  15. Permit Mechanical Fuel Gas Permit Finaled

    Install gas line, approximately 220ft, to supply 1 heating unit (200,000 BTUS)

    Permit
    23-00886-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $8,500
    Fees
    $64
    Days from application to issue
    6
    Expires
    Jul 17, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  16. Permit Mechanical HVAC Permit Cancelled

    (1) 7.5 ton package unit

    Permit
    22-32951-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $52,000
    Fees
    $110
    Contractor
    Garrison Builders, LLC
    1. Application submitted

    See this permit on One Stop

  17. Permit Mechanical HVAC Application Accepted

    Install 3.5 ton heat pump

    Permit
    22-32853-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $202,265
    Fees
    $68
    Contractor
    Garrison Builders, LLC
    1. Application submitted

    See this permit on One Stop

  18. Permit Mechanical HVAC Permit Finaled

    Install 7.5 ton package unit and 15 ton roof top unit.

    Permit
    22-32850-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $202,265
    Fees
    $146
    Contractor
    Garrison Builders, LLC
    Days from application to issue
    4
    Expires
    May 1, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  19. Permit Mechanical HVAC Permit Cancelled

    Install 6 ton package unit

    Permit
    22-32848-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $202,265
    Fees
    $30
    Contractor
    Garrison Builders, LLC
    1. Application submitted

    See this permit on One Stop

  20. Permit Mechanical HVAC Application Accepted

    Install 15 ton RTU

    Permit
    22-32847-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $202,265
    Fees
    $131
    Contractor
    Garrison Builders, LLC
    1. Application submitted

    See this permit on One Stop

  21. Permit Electrical Repair / Replacement / Addition Permit Finaled

    Wire commercial space according to drawings

    Permit
    22-32693-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $20,000
    Fees
    $250
    Contractor
    Edward Leroy Dawson
    Days from application to issue
    15
    Expires
    May 11, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  22. Permit Renovation (Non-Structural) Occupancy

    NON-STRUCTURAL RENOVATION OF TENANT SPACE Patron Saint - Wine Shop Interior built out of a wine shop including a cash wrap and holding bar, built in shelving and back of house office and storage space. Plumbing scope includes the water and sewer needs associated with the holding bar construction - note that the bathroom is being built out under the landlord permit. Mechanical scope includes running ductwork from landlord provided unit, and all new electrical will be run from landlord provided panel in space.

    Permit
    22-11681-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $211,987
    Fees
    $1,457
    Days from application to issue
    366
    Expires
    Oct 20, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  23. Permit Renovation (Non-Structural) Occupancy

    NON-STRUCTURAL RENOVATION OF TENANT SPACE St. Pizza - Standard Restaurant Interior build out of a standard restaurant including a pizza station, holding bar and small commercial kitchen. Plumbing scope includes the water and sewer needs of pizza station, holding bar and commercial kitchen - note that the bathroom is being built out under the landlord permit. Mechanical scope includes running ductwork from landlord provided unit and all new electrical will be run from landlord provided panel in space.

    Permit
    22-11683-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $399,973
    Fees
    $2,460
    Days from application to issue
    366
    Expires
    Oct 20, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  24. Permit Construction Loop Permit Finaled

    Install Temporary Pole

    Permit
    22-03168-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $800
    Fees
    $40
    Contractor
    Edward Leroy Dawson
    Days from application to issue
    1
    Expires
    Aug 2, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  25. Permit Interior Demolition Permit Issued

    INTERIOR DEMOLITION OF AN EXISTING WAREHOUSE BUILDING INCLUDING SELECT WALLS, FIXTURES AND FINISHES TO PREPARE FOR FULL RENOVATION.

    Permit
    21-32667-DEMI
    Type
    Interior Demolition
    Work
    Interior Demolition
    Estimated cost (applicant’s figure)
    $87,450
    Fees
    $500
    Contractor
    Garrison Builders, LLC
    Days from application to issue
    31
    Expires
    Jun 23, 2022
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  26. Permit Renovation (Structural) Occupancy

    RENOVATION OF AN EXISTING WAREHOUSE BUILDING TO SUPPORT 5 TOTAL TENANTS. NEW SPRINKLER SYSTEM PROPOSED. TCO TO FINISH--GOOD TILL 12-30-23

    Permit
    21-29242-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $1,470,224
    Fees
    $9,136
    Contractor
    Garrison Builders, LLC
    Days from application to issue
    214
    Expires
    Nov 20, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  27. Permit Renovation (Non-Structural) Other

    Converting a commercial laundry to a artisinal manufacturing studio per sketch. No work being done.

    Permit
    19-10902-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $100
    Fees
    $65
    1. Application submitted
    2. Application review

    See this permit on One Stop

  28. Permit Mechanical Annual Renewal Active

    ANNUAL INSURANCE INSPECTION

    Permit
    06MCH-05745
    Type
    Mechanical
    Work
    Stationary Equipment Annual
    Estimated cost (applicant’s figure)
    $0
    Fees
    $280
  29. Permit Sign

    DETACHED SIGN DRY CLEANING SHOP SIGN FEE 2004 PAID FOR 1

    Permit
    S04000710
    Type
    Sign
    Days from application to issue
    0
  30. Permit Sign

    PROJECTING SIGN DRY CLEANING SHOP SIGN FEE 2003 PAID FOR 1

    Permit
    S03000615
    Type
    Sign
    Days from application to issue
    0
  31. Permit Mechanical Annual Fee Pending
    Permit
    03MCH-07315
    Type
    Mechanical
    Work
    Stationary Equipment Annual
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
  32. Permit Sign

    PROJECTING SIGN DRY CLEANING SHOP SIGN FEE 2001 PAID

    Permit
    S01000290
    Type
    Sign
    Days from application to issue