Plum Orchard

4939 Pecan Street is in Plum Orchard, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 1 permit on record here; the most recent, a demolition permit, was filed in August 2006. 1 is still open. A demolition permit was filed in August 2006. There were 3 past code enforcement cases, the latest in May 2026, all closed. On this block in the past year: 15 requests to 311 and 5 calls to police.

Zoning
S-RD
Historic district
None
Council district
E
Ward
9
Lot size
5,650 sq ft
Parcel
41180867

Everything on record here

4 records, newest first · 1 open

  1. Code enforcement Case 26-04811-MPM Closed

    A hearing was held on 09/30/2026 with a result of "Dismissed: Abated". The case was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 160 Weeds and Plant Growth
    3. Hearing: Initial Hearing Dismissed: Abated

    The city links this case to permit 06BLD-05634.

  2. Code enforcement Case HCES-11-02750 Closed

    A hearing was held on 07/31/2014 with a result of "Dismissed Wrong Location". The case was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Driveways
    4. Violation: 159 Sidewalks
    5. Violation: 160 Weeds and Plant Growth
    6. Violation: 161 Rodent Harborage
    7. Hearing: Initial Hearing Dismissed Wrong Location
    8. Inspection: Posting of Hearing Notice No Violation

    The city links this case to permit 06BLD-05634.

  3. Code enforcement Case HCES-11-02749 Closed

    The property was inspected on 04/17/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied

    The city links this case to permit 06BLD-05634.

  4. Permit Demolition Application Acceptance - Approved No Review

    Demolish Hurricane damaged single to grade. Outside of the housing conservation district. Any further use shall require a separate permit.

    Permit
    06BLD-05634
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $13,900
    Fees
    $145
    Days from application to issue
    5